13.02.2015 Views

OPERATIONS MANUAL

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Procedures<br />

Preliminary Cockpit Preparation:<br />

Maintenance status<br />

Electrical power<br />

Ground interphone<br />

CHECK<br />

ESTABLISH<br />

SET<br />

b<br />

2<br />

2<br />

Check logbook and MEL requirements.<br />

Check bus tie switches are set to AUTO.<br />

If external power is required, push<br />

respective EXT PWR switch and check<br />

ON light is illuminated.<br />

If APU power is required, start the APU,<br />

wait 30 seconds, then push APU GEN 1<br />

switch, then APU GEN 2 switch; check<br />

ON lights are illuminated.<br />

Confirm FLT is selected on ACP and<br />

speaker volume is turned up.<br />

Ground test switch<br />

CLOSED<br />

Flight control shutoff switches CLOSED<br />

Refueling switches<br />

CLOSED<br />

Generator field reset switches CLOSED<br />

Split system breaker switch CLOSED<br />

Towing power switch<br />

OFF<br />

Cargo air flow rate selector AS REQUIRED<br />

Voice recorder<br />

TEST<br />

2<br />

2<br />

2<br />

2<br />

2<br />

2<br />

2<br />

2<br />

Push and hold the test switch for<br />

7 seconds and check the needle stays<br />

within the green band.<br />

IRS on battery light<br />

EEC maintenance switches<br />

Defueling switches<br />

Circuit breakers P7<br />

Emergency equipment<br />

Ship’s papers<br />

Circuit breakers P6<br />

EXTINGUISHED<br />

CLOSED<br />

CLOSED<br />

CHECK<br />

CHECK<br />

CHECK<br />

CHECK<br />

2<br />

2<br />

2<br />

2<br />

2<br />

2<br />

2<br />

— Page 561 —<br />

For preview only. Not for sale. Many pages are intentionally removed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!