12.07.2015 Views

TOTAL STATION InstructIon manual

TOTAL STATION InstructIon manual

TOTAL STATION InstructIon manual

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

[Generation of principal peg to be recorded by calculation and measurement point name of• In case of Simple curve;BC#、EC#、SP#(「#」 of measurement point name of principal peg has actually become IP number.)• In case of basic design clothoid;KA#-1、KE#-1、KE#-2、KA#-2、SP#• In case of raised type clothoid;KA#-1、KE#-12、KA#-2[The curve to be used in road design]The curve mentioned in the right drawing can not be used , which is called reverse IP or IPcurve, although it can be used with basic design clothoid, raised type clothoid and simplecurve (see left drawing).IPIPBPEPBPEPOKNot used[Terms and curves to be used in Road Calculation]BP Beginningpoint of routeIPEPEnd point ofrouteIAIntersectionpoint of maintangentIntersectionpoint of maincontactCurve lengthBC Beginning ofcurveCLEC End of curve SP Secant pointKA Beginning ofclothoid curveKE End of clothoidcurveIP3BC1IP1EC1SP1KA2-1Curve 2KA3-1KE2-12KA2-2KE3-1SP3KE3-2KA3-2BPCurve 1 Curve 3IP2EP108

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!