12.07.2015 Views

Stoke-on-trent sport and physical activity strategy 2009-2016

Stoke-on-trent sport and physical activity strategy 2009-2016

Stoke-on-trent sport and physical activity strategy 2009-2016

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 2:Facility proposals listFacility proposals list- main facilities <strong>and</strong> smaller local facilities where changes are proposedSite Facility Proposal to meet community <strong>sport</strong> <strong>and</strong><strong>physical</strong> <strong>activity</strong> needs20:20 Discovery AcademyManagement Strategyintensity level (site(H=high, L=Low) overall)Locati<strong>on</strong>(NeighbourhoodManagement Area)Hall New 4 court hall. Specialist design for badmint<strong>on</strong>. H H South EasternSTPFull-size STP (or if not progressed, at L<strong>on</strong>gt<strong>on</strong>Leisure Centre)Multi-purpose fitness suite Junior <strong>and</strong> adultTennis courtsDevelop 3 courts suitable for pay <strong>and</strong> playBall Green Youth Centre Building <strong>and</strong> Playing Fields Develop existing redundant sites as a communityfacility, possibly including: dance/aerobics, tennis,5-a-side football <strong>and</strong> grass pitches. Will requireimproved access in additi<strong>on</strong> to other investment.L L NorthernBerry Hill High School HallClosen/a n/a EasternTennis courtsCloseBeaufort Road Tennis Court Tennis courts Rec<strong>on</strong>sider with local c<strong>on</strong>sultati<strong>on</strong> the future L L South Easternopti<strong>on</strong>s for this site.Birches Head High School Hall Refurbish to meet school needs <strong>on</strong>ly. L L EasternBlurt<strong>on</strong> High SchoolPoolRefurbish existing pool. Improve pool changing.Add hydrotherapy poolLSa South WesternHallNew 4 court hall. Specialist design for badmint<strong>on</strong>.STPC<strong>on</strong>sider development of full size pitch suitable forcommunity use (or alternatively at Trentham).Athletics trainingTraining facility e.g. 6 lane x 100 m straight, 4 lane200m J track or 2 lane 400 m track, or 3 lane 300m trackBrownhills High School HallNew 4 court hall to meet curriculum need.Specialist netting <strong>and</strong> associated design for indoorcricket <strong>and</strong> badmint<strong>on</strong>. Site to be a satellite centreto S<strong>and</strong><strong>on</strong> for cricket.LSa NorthernSTPFull size STP.Ancillary hallHall suitable for dance <strong>and</strong> gymnastics, withsufficient storage for equipment.Bucknall Park Tennis courts Retain <strong>and</strong> refurbish L L EasternBurslem Park Tennis courts Retain <strong>and</strong> refurbish, including floodlights(or L Sa Northerncabling for floodlights which can be provided atlater date). Include in the Green Space StrategyActi<strong>on</strong> Plan <strong>and</strong> North Staffs Regnerati<strong>on</strong>Partnership proposals.Central Forest Park Skate park Retain H S-H WesternCentury Street Park Skate Park Retain <strong>and</strong> improve L L WesternChaterley Whitfield Playing fields Provide changing L L NorthernChaterley Whitfield CISWO site Playing fieldsDevelop the CISWO site into a FootballL H NorthernDevelopment Centre. Site to be the equivalentarea of 4 senior football pitches with ancillaryfacilities <strong>and</strong> potentially other facilities.Dimensi<strong>on</strong>s Leisure Centre PoolDevelop a 25 m x 6 lane pool in additi<strong>on</strong> to thecurrent leisure pool. This will be a replacement forTunstall Pool.H S-H NorthernHallRefurbish.STPsRetain <strong>and</strong> refurbish.Ancillary hallAdd multi-purpose hall suitable for dance <strong>and</strong>aerobic activities.Health <strong>and</strong> fitness Retain.Gymnastics centre Possible site for specialist gymnastics centre as areplacement / satellite for the Gymnastics Centrein Burslem. If developed, the facility would belarger <strong>and</strong> cater for more disciplines than thecurrent Gymnastics Centre.Edensor High School Tennis courts & buildings Undertake a full feasibility study <strong>on</strong> the possiblefuture leisure uses of the site, including as a tenniscentre. Protect site for community leisure use untilthe feasibility study is completed.L H South EasternPlaying fieldsRetain for community football useFallowfields Playing fields Provide changing L L South WesternNortoft Partnerships Ltd <str<strong>on</strong>g>Stoke</str<strong>on</strong>g>-<strong>on</strong>-Trent Page | 345Sport & Physical Activity Strategy <strong>2009</strong>-<strong>2016</strong>October <strong>2009</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!