12.07.2015 Views

Stoke-on-trent sport and physical activity strategy 2009-2016

Stoke-on-trent sport and physical activity strategy 2009-2016

Stoke-on-trent sport and physical activity strategy 2009-2016

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Site Facility Proposal to meet community <strong>sport</strong> <strong>and</strong><strong>physical</strong> <strong>activity</strong> needsJames Brindley HighSchool/Sports CentrePoolHallSTPAthletics trainingAncillary hallMulti-purpose fitness suitePlaying fieldsRetain. Full community use.RetainFull-sizeTraining facility e.g. 6 lane x 100 m straight, 4 lane200m J track or 2 lane 400 m track, or 3 lane 300m trackMulti-purpose hall suitable for dance, martial arts<strong>and</strong> boxing. With large storage spaceDevelop junior <strong>and</strong> adult facilities.Secure 'surplus' pitches for l<strong>on</strong>g term communityuse. Undertake a full feasibility study to c<strong>on</strong>firm ifthe site is appropriate to host a Rugby FootballClub. If not suitable for a rugby club, developpitches for community football use.Management Strategyintensity level (site(H=high, L=Low) overall)HHLocati<strong>on</strong>(NeighbourhoodManagement Area)NorthernL<strong>on</strong>gt<strong>on</strong> High School Playing fields Secure for l<strong>on</strong>g term community use. Add L L South Easternchanging <strong>and</strong> ancillary provisi<strong>on</strong> as necessary.C<strong>on</strong>sider link to Foley Football Club <strong>and</strong>development as a football centre.L<strong>on</strong>gt<strong>on</strong> Leisure Centre (new) SiteNew facility proposed for L<strong>on</strong>gt<strong>on</strong>. Feasibility workto be undertaken, but it is proposed to provide thefollowing facilities.Pool25 x 4 lane community pool near L<strong>on</strong>gt<strong>on</strong> towncentre.HHSouth EasternHall 3 court (or 1+2)STPIf provisi<strong>on</strong> at 20:20 Discovery Academy is notprogressed, full size STPHealth <strong>and</strong> fitness Facility available <strong>on</strong> pay <strong>and</strong> play basis.BoxingDedicated space for boxingL<strong>on</strong>gt<strong>on</strong> RUFC STP small Retain L H South WesternGrass pitchesA full technical report <strong>on</strong> pitches will be required ifSouth Westernthey are to be used by the school in additi<strong>on</strong> toclub. This will need to c<strong>on</strong>firm any necessaryupgrading of the pitches <strong>and</strong> the l<strong>on</strong>g termmaintenance regimes (including cost).Meir Fitness Centre Health <strong>and</strong> fitness Retain L L South EasternMount Pleasant ParkTennis courtsRetainL L South WesternPlaying fieldsProvide changingMitchell School Playing fields Secure for l<strong>on</strong>g term community use. Undertake a L H Easterndetailed feasibility study to c<strong>on</strong>firm if the site issuitable for the relocati<strong>on</strong> of a rugby club to thesite. Should this not be viable retain the pitches forcommunity football use.New <str<strong>on</strong>g>Stoke</str<strong>on</strong>g> Park Tennis courts Retain. L L South WesternNorthwood StadiumSiteC<strong>on</strong>sider the mix of facilities <strong>and</strong> <strong>sport</strong>s to be H S-H Westernprovided <strong>on</strong>ce the opti<strong>on</strong>s at the Fent<strong>on</strong> Manor sitehave been determined. The opti<strong>on</strong>s at Northwoodinclude the expansi<strong>on</strong> <strong>and</strong> improvement of the siteas a specialist centre for athletics <strong>and</strong> netball <strong>and</strong>the introducti<strong>on</strong> of improved disability opportunities.The site will remain important for local communityuse <strong>and</strong> retain a range of community <strong>sport</strong>sfacilities. However, further facility development isalso dependent up<strong>on</strong> suitable ground c<strong>on</strong>diti<strong>on</strong>s.HallRefurbish the 6 court as a specialist facility fornetball.Athletics indoorDevelop indoor athletics training as part of thefacility (or locate at Fent<strong>on</strong>).Athletics trackRetain <strong>and</strong> refurbish (or relocate to Fent<strong>on</strong>).Health <strong>and</strong> fitness Retain <strong>and</strong> refurbish with special c<strong>on</strong>siderati<strong>on</strong> toreflect the main <strong>sport</strong>s <strong>on</strong> site including netball,athletics (if not relocated), <strong>and</strong> disability <strong>sport</strong>.Ancillary hallAdd multi-purpose hall with large storage spacesuitable for dance, martial arts <strong>and</strong> boxing.Packmoor Playing fields Provide changing L L NorthernPark Hall Golf Course Driving range Possibly up to 25 bays. H H EasternRiverside Road Playing fields Provide changing. L L South WesternSt Joseph's College Hall If developed <strong>on</strong> site, enable community access <strong>on</strong>South Westerna low intensity management basisTennis Courts/MUGA If developed <strong>on</strong> site, enable community access <strong>on</strong>South Westerna low intensity management basisSt Joseph's Primary School Tennis courts Retain L Sa NorthernSt Peters High School HallClose. Replace by development at Thistley Hough. H H South WesternSt Thomas More Catholic HighSchoolSTP smallTennis courtsHallClose. Replace by development at Thistley HoughDevelop new pavili<strong>on</strong> <strong>on</strong> site plus ancillary facilitiesas necessary. Transfer management to thecommunity.C<strong>on</strong>sider replacement. If replaced, c<strong>on</strong>sidercommunity use (low intensity management)L Sa South EasternNortoft Partnerships Ltd <str<strong>on</strong>g>Stoke</str<strong>on</strong>g>-<strong>on</strong>-Trent Page | 347Sport & Physical Activity Strategy <strong>2009</strong>-<strong>2016</strong>October <strong>2009</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!