12.07.2015 Views

Stoke-on-trent sport and physical activity strategy 2009-2016

Stoke-on-trent sport and physical activity strategy 2009-2016

Stoke-on-trent sport and physical activity strategy 2009-2016

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Site Facility Proposal to meet community <strong>sport</strong> <strong>and</strong><strong>physical</strong> <strong>activity</strong> needsFent<strong>on</strong> ManorSiteSite to be developed working with major partnerssuch as Building Schools for the Future <strong>and</strong> theNati<strong>on</strong>al Governing Bodies of Sport as a SportsVillage with a focus <strong>on</strong> Performance level <strong>sport</strong>.Management Strategyintensity level (site(H=high, L=Low) overall)Locati<strong>on</strong>(NeighbourhoodManagement Area)H CSP South WesternPoolHallGymnastics centreVeloparkIndoor Athletics Centre & 8-lane trackA full site feasibility study will be undertaken <strong>on</strong>cethe educati<strong>on</strong> site proposals are clarified (includingthe relocati<strong>on</strong> of St Peters school). This feasibilitystudy will determine the future facility opti<strong>on</strong>s,including the facilities listed below plus any othersrequired to meet both the educati<strong>on</strong> <strong>and</strong> widercommunity needs. This may include adjoiningl<strong>and</strong> areas in additi<strong>on</strong> to the current site.Undertake full c<strong>on</strong>diti<strong>on</strong>s survey to c<strong>on</strong>firmexpected lifespan. Refurbish pool or planreplacement (bey<strong>on</strong>d <strong>2016</strong>).Retain <strong>and</strong> refurbish, taking into c<strong>on</strong>siderati<strong>on</strong> thepossible requirements arising from its potentialuse as a Pre-Games Training Camp <strong>and</strong> as anevents venue, particularly for netball <strong>and</strong> tabletennis.Possible site (but not necessarily as part of theCentre) for the specialist gymnastics centre as apotential replacement for the Gymnastics Centre inBurslem. Facility to be larger <strong>and</strong> to cater for moredisciplines.This may include a floodlit cycle circuit of approx1km, for racing <strong>and</strong> training (<strong>and</strong> also provide forrunning <strong>and</strong> Nordic skiing). Provisi<strong>on</strong> for othercycle disciplines may also be c<strong>on</strong>sidered.Possible site for the relocati<strong>on</strong> of the athleticsprovisi<strong>on</strong> currently at Northwood (8-lane track withspectator facilities). If the outdoor track isdeveloped, provisi<strong>on</strong> of the Indoor Athletics Centreto meet sub-regi<strong>on</strong>al (SASSOT) needs.Retain <strong>and</strong> refurbish.Retain <strong>and</strong> refurbish.Health <strong>and</strong> fitnessOther facilitiesFent<strong>on</strong> Park Tennis courts Retain <strong>and</strong> refurbish. C<strong>on</strong>sider floodlights, or atminimum provide cabling for floodlights at a laterdate.H H South WesternFlorence Sports <strong>and</strong> Social STP small Retain L Sa South EasternClubFlorence Tennis <strong>and</strong> Bowling Tennis courts <strong>and</strong> bowling Retain L H South EasternClubgreensFoley Park Sports court Retain <strong>and</strong> refurbish L L South WesternGrange Park Playing fields Provide changing L L WesternGoals Football (Holden Lane) STPs small Retain H Sa EasternGymnastics CentreSpecialist Gymnastics Replace facility at Burslem with improved larger / H S-H NorthernCentresatellite site providing for wider range of disciplines<strong>and</strong> abilities. Possibly near the Dimensi<strong>on</strong>s site,or Fent<strong>on</strong> Manor.Hanford ParkSports CourtRetain <strong>and</strong> improveLLSouth WesternSkate ParkRetain <strong>and</strong> improveHanley ParkSTP smallRetainHHWesternTennis courtsRetain <strong>and</strong> refurbish. Floodlights.Bowling greensRetain <strong>and</strong> improve.Playing fieldsProvide changingHardman Football Dev Centre STP small Retain H H EasternHaywood High School Sports HallDevelop a 3 court <strong>sport</strong>s hall for generalcommunity use but <strong>on</strong> low intensity management.LSa NorthernAncillary hallMulti-purpose hall(s) suitable for martial arts <strong>and</strong>dance.BoxingDedicated space for boxing.Holden Lane High School PoolMinor refurbishment. Centre for curriculum LSa Easternswimming but also with limited community use.HallRetain. C<strong>on</strong>sider l<strong>on</strong>g term opti<strong>on</strong> ofrefurbishment for badmint<strong>on</strong>.HHSTPRetainMulti-purpose fitness suite Develop junior <strong>and</strong> adult facilities.Ancillary hallAdd multi-purpose hall suitable for dance <strong>and</strong>aerobic activitiesTennis CourtsImprove court surface <strong>and</strong> add floodlighting, Makeavailable for community use.Holdcroft Road Playing fields Replace pitch if lost to development L L EasternNortoft Partnerships Ltd <str<strong>on</strong>g>Stoke</str<strong>on</strong>g>-<strong>on</strong>-Trent Page | 346Sport & Physical Activity Strategy <strong>2009</strong>-<strong>2016</strong>October <strong>2009</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!