February 2004<br />

- The Pastra-Kirilova Polyana black-top road (17 km);<br />

- The Pastra-Kalin Dam concrete-top road (17 km);<br />

- The Kirilova Polyana-Tiha <strong>Rila</strong> gravel road (9 km);<br />

- Gravel road at Elevation 2000 (16 km);<br />

- The Kamenitsa River-Radovishka River dirt road (4 km);<br />

- The Vladichina Livada-Bukovo Berdo dirt road (7 km);<br />

11. Water dams at Lake Gorno Ribno, Lake Dolno Ribno and Lake Smradlivo (0.3 ha<br />

total);<br />

12. Flow-measuring weir by the Rilska River bridge at Brichebor locality (0.1 ha) –<br />

Veli Lag water gauge section;<br />

Regimes for the Technical Infrastructure Zone<br />

Any human acts and activities are strictly forbidden except those as per Paragraph<br />

1.1.1 above, and the following:<br />

1. Functional improvements of the above listed facilities and installations according<br />

to their intended purpose;<br />

2. Routine maintenance of the infrastructure;<br />

3. Building of fish ducts;<br />

4. Building of water purification facilities for existing buildings or newlyconstructed<br />

buildings and facilities, and/or, where necessary, of septic tanks with<br />

water-proofed walls;<br />

5. Building of specially designed discharge facilities allowing the discharge of<br />

ecologically optimal amounts of water into the downstream river current;<br />

6. Installation of safety measures in existing facilities (closing of disused tunnels<br />

with grating, removal of disused buildings and facilities, etc.);<br />

7. Setting up of a system of hydrometric and meteorological stations;<br />

8. Setting up of a solid waste collection system and providing the means for removal<br />

thereof;<br />

9. Building of a lodge for the maintenance crews of Dams and Cascades National<br />

Hydropower Complex, Blagoevgrad regional branch at Kalin water catchment<br />

area.<br />

10. Building of 2 Micro HPS for local electric supply of the NEC building located by<br />

Kalin’s Dam wall and the residential Beloborski Dol.<br />

Norms<br />

1. The present nominal operational capacities of all facilities shall be retained<br />

according to their design specifications;<br />

2. Only officers of Dams and Cascades National Hydropower Complex executing<br />

their obligations may stay in the auxiliary buildings. When other people visit the<br />

buildings for more then one day the NPD should be informed for their number<br />

and stay period.<br />

3. The Micro HPS for local electricity supply will not exceed 6 KV;<br />

Recommendations<br />

1. Routine repairs and maintenance activities shall be done, where possible, in such<br />

a way as not to interfere with the breeding season of animals.<br />

<strong>Rila</strong> <strong>Monastery</strong> <strong>Nature</strong> <strong>Park</strong><br />

<strong>Management</strong> <strong>Plan</strong>-Draft<br />

2004 - 2013<br />

200