04.12.2012 Views

Rila Monastery Nature Park Management Plan - part - usaid

Rila Monastery Nature Park Management Plan - part - usaid

Rila Monastery Nature Park Management Plan - part - usaid

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

February 2004<br />

2.7.8 Program for providing the requisite technical equipment and information<br />

technology to the <strong>Park</strong> administration and for information management<br />

• Project: Maintaining a common database for nature components and sites of<br />

cultural and historical heritage in <strong>Rila</strong> <strong>Monastery</strong> <strong>Nature</strong> <strong>Park</strong><br />

Maintaining, updating and optimum use of the database on biodiversity in RMNP<br />

built during the planning process. Based upon the available information contained in<br />

the present database, a system for monitoring environmental components and the<br />

impact of the tourist flow is to be developed (see 2.2.8)<br />

The database also contains information about available infrastructure in the <strong>Park</strong> and<br />

should therefore be used as a tool for managing that infrastructure.<br />

The proposed database for monitoring the state and condition of religious, cultural<br />

and historical sites is to be incorporated as <strong>part</strong> of the common database (see 2.1.1)<br />

• Project: Development of the Geographic Information System<br />

This envisions the further development of the Geographic Information System created<br />

by the BCEG Project during the development of the <strong>Management</strong> <strong>Plan</strong>, its proper<br />

maintenance, operation, updating, and enrichment with new data; the introduction of<br />

rules of access of the digital models, and the exchange of information with other<br />

institutions in compliance with applicable legislation.<br />

The Project also envisions developing an action plan and providing the necessary<br />

funds for purchasing the requisite hardware and software for the development and<br />

operation of GIS of RMNP.<br />

• Project: Provision of the requisite material and technical equipment for the <strong>Park</strong><br />

administration<br />

Development and consolidation of the material base and technical equipment of the<br />

<strong>Park</strong> management; provision of the necessary office equipment and supplies, as well<br />

as of another all-terrain vehicle for fieldwork and three motorcycles.<br />

The project also envisions providing suitable locations for offices and shelter for the<br />

<strong>Park</strong> rangers, two for each of the valleys of the Rilska and Iliyna Rivers and for the<br />

area of Kalin. As a first stage, initial contacts and negotiations will be initiated with<br />

the respective institutions for the use of existing facilities, e.g. the residential<br />

buildings of Dams and Cascades, Ribni Ezera Chalet, a.o.<br />

• Project: Building of an internal communications system for RMNP<br />

The Project aims to provide the necessary communications equipment (two-way<br />

radio) to the <strong>Park</strong> management, to some of its <strong>part</strong>ners in the <strong>Park</strong> territory (Dams and<br />

Cascades, chalet-keepers, etc.); it also envisions setting up a system for the<br />

coordinated exchange of information and, when necessary, for interaction in<br />

emergencies, forest fires, rescue operations, etc.<br />

<strong>Rila</strong> <strong>Monastery</strong> <strong>Nature</strong> <strong>Park</strong><br />

<strong>Management</strong> <strong>Plan</strong> - Draft<br />

2004 - 2013<br />

234

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!