12.01.2013 Views

PC3000 Complete Installation guide iss 12 - Elektro-Trading

PC3000 Complete Installation guide iss 12 - Elektro-Trading

PC3000 Complete Installation guide iss 12 - Elektro-Trading

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The Power Supply<br />

CONFIGURATION OPTIONS<br />

4-4<br />

The following items must be checked prior to installing the module in the rack:<br />

· Ensure that the watchdog or health relay operation is set:<br />

(1) To activate after repeated watchdog errors and 1s delay following<br />

detection of the first occurrence (Holdoff).<br />

(2) To activate immediately following detection of first error. See page 4-5<br />

'Setting the Watchdog Relay Operation'.<br />

WARNING<br />

Ensure that the selected voltage range is correct before applying the<br />

mains supply.<br />

Removing the metal sleeve<br />

Caution<br />

The module contains static sensitive components and care must be<br />

taken to ensure that the surface onto which the printed circuit board<br />

assemblies are to be placed and the user are at the same potential.<br />

Standard anti-static precautions should be observed.<br />

If full anti-static precautions cannot be observed, personal grounding<br />

may be achieved by touching an earthed metal chassis or component<br />

prior to handling the module.<br />

The metal sleeve must be removed in order to gain access to the motherboard:<br />

(1) Remove the M3 screw and shakeproof washer which retains the printed circuit<br />

board earthing block to the sleeve, from the lower left hand side of the metal<br />

sleeve.<br />

<strong>PC3000</strong> <strong>Installation</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!