12.01.2013 Views

PC3000 Complete Installation guide iss 12 - Elektro-Trading

PC3000 Complete Installation guide iss 12 - Elektro-Trading

PC3000 Complete Installation guide iss 12 - Elektro-Trading

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DIAGNOSTICS<br />

Status indication<br />

RACK<br />

INTERFACE COMMUNICATIONS<br />

F R C S<br />

4 2 1 EXT. RACK NUMBER<br />

<strong>PC3000</strong> - <strong>Installation</strong> Guide <strong>iss</strong>. 3<br />

F = Fault<br />

R = Run<br />

C = Extension Rack Communication activity<br />

S = Reserved for future development<br />

Ext rack<br />

eg. rack 6 = 4 2 1<br />

Rack Interface Module<br />

The RIM has a set of status indicators which are visible through the rack fascia. The<br />

primary functions and positions are shown above.<br />

Fault indicators will be illuminated during initialisation and during reset. During<br />

normal operation the two green status indicators will be illuminated.<br />

The upper group of four indicators are:<br />

Function Colour Notes<br />

System Run Green System passed all power on tests and ‘healthy’<br />

System Fault Red System watchdog or reset has occurred<br />

Comms active Green Power on confidence tests passed and 'healthy'<br />

Swap Green Reserved for future development<br />

Procedure in the event of faults<br />

(1) Is the rack address set correctly ?<br />

Check that two racks do not share the same address.<br />

(2) Failure to communicate with the modules in the extension rack.<br />

Are any of the I/O modules registered as 'Actual Module' on the Hardware<br />

Definition screen ?<br />

Are analogue input or output modules listed on the screen but no digital I/O ?<br />

Is the inter-rack cable sound ?<br />

Are the modules fitted in the extension rack of the correct type (i.e. any module<br />

except communication or combined analogue input or output) ?<br />

(3) Is the communications link terminated correctly?<br />

Ensure that LK 8 and 9 are fitted to the LAST rack only.<br />

7-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!