Applied Biosystems SOLiD™ 4 System SETS Software User Guide ...
Applied Biosystems SOLiD™ 4 System SETS Software User Guide ...
Applied Biosystems SOLiD™ 4 System SETS Software User Guide ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
4<br />
Chapter 4 View Reports<br />
View overall run reports<br />
Parameter Normal Run Problematic Run<br />
Failed panels In general, the number of failed panels<br />
should be relatively small and<br />
consistent.<br />
Fraction of Best +<br />
Good<br />
beads/Usable<br />
beads<br />
Effective exposure<br />
times<br />
The fraction can vary depending on<br />
the quality of the library, the efficiency<br />
of the PCR, and the enrichment<br />
process. As a guideline, the fraction is<br />
around 0.5 to 0.6 in the first ligation<br />
cycle of each primer and drops to 0.2<br />
to 0.3 in the last cycle.<br />
Gradual increase from ligation cycles<br />
1 to 5 or higher for each sequence<br />
primer. Performance varies from slide<br />
to slide and as a function of the age of<br />
the SOLiD Light Source. As a<br />
guideline, the effective exposure time<br />
is typically 20 to 40 ms in the first<br />
ligation cycle and increases to 100 to<br />
300 ms in the fifth cycle.<br />
Satay plots The first cycle of any primer should<br />
show a relatively “clean” Satay plot,<br />
with most points clustered on the four<br />
color axes and with minimal fraction of<br />
the points clustered around the origin.<br />
The quality of the Satay plot typically<br />
degrades gradually with each ligation<br />
cycle for a single primer cycle,<br />
becoming more “fuzzy” in the last<br />
cycle.<br />
Run begins with extremely high<br />
number of failed panels or dramatic<br />
increase in any subsequent ligation<br />
cycle for each sequencing primer.<br />
A significant drop in the fraction of<br />
good beads in the initial ligation<br />
cycles is a reason to pause the run<br />
and troubleshoot the performance.<br />
250 ms or greater in ligation cycle 1 or<br />
when instrument times out when the<br />
effective exposure time exceeds 500<br />
ms. Long exposure times may<br />
indicate replacement of the SOLiD <br />
Light Source.<br />
An abnormal “fuzzy” Satay plot in the<br />
first cycle is a reason to pause the run<br />
and troubleshoot the performance.<br />
70 <strong>Applied</strong> <strong>Biosystems</strong> SOLiD 4 <strong>System</strong> <strong>SETS</strong> <strong>Software</strong> <strong>User</strong> <strong>Guide</strong>