07.02.2013 Views

PhD Thesis - Energy Systems Research Unit - University of Strathclyde

PhD Thesis - Energy Systems Research Unit - University of Strathclyde

PhD Thesis - Energy Systems Research Unit - University of Strathclyde

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

eing used each day for a continuous supply, or that the feedstock availability is<br />

stretching across the desired time period for seasonal supplies.<br />

Along with the graph <strong>of</strong> fuel production over time, information is given about<br />

the amount <strong>of</strong> unprocessed feedstock remaining at the end <strong>of</strong> the simulation, and<br />

the maximum amount <strong>of</strong> feedstock that has required storage at any one time<br />

throughout this period. Again, when using seasonal supplies, it is misleading to<br />

simulate anything less than a year.<br />

Yes<br />

Feed = Yield x Land /<br />

No. <strong>of</strong> harvest Days<br />

j = j - TS Yes<br />

Is feedstock<br />

availability seasonal ?<br />

No<br />

j = i<br />

Is j ><br />

TS - 1 ?<br />

Determine date<br />

using i value<br />

St or = St or - ( St or x<br />

Degrade / 1 00)<br />

No<br />

Yes<br />

Is j =<br />

Yes No<br />

TS - 1 ?<br />

Is date between or<br />

on harvest dates ?<br />

Yes<br />

MaxStor = Stor<br />

Yes<br />

No<br />

Elec = 0<br />

Heat = 0<br />

Is feedstock<br />

availability seasonal ?<br />

Yes<br />

Is j =<br />

TS - 1 ?<br />

Is Stor ><br />

MaxStor ?<br />

(Figure 6.3)<br />

No<br />

No<br />

St or = St or - ( St or x<br />

Degrade / 1 00)<br />

181<br />

Feed = Amount <strong>of</strong> Feedstock Available (kg/day)<br />

Yield = Crop Yield (kg/ha)<br />

Land = Available Cropland (ha)<br />

i = Timestep Through Simulation<br />

j = Timestep Through Day<br />

TS = Number <strong>of</strong> Timesteps per Day<br />

Stor = Amount <strong>of</strong> Stored Feedstock (kg)<br />

Degrade = Degradation Rate (% weight loss<br />

per day)<br />

Elec = Electricity Required (kW)<br />

Heat = Heat Required (kW)<br />

FeedElec = Electricity Required for Feedstock<br />

Processing (kW/kg)<br />

MaxStor = Maximum Amount <strong>of</strong> Storage<br />

Required over the Simulation Period (kg)<br />

No<br />

Yes<br />

Stor = Stor + Feed<br />

Yes<br />

Elec = Feed x<br />

FeedElec / 24<br />

Yes<br />

Is j = 0 and<br />

i > 0 ?<br />

Is j = 0 ?<br />

Is electricity for<br />

feedstock processing<br />

required 24 hrs ?<br />

Yes<br />

No<br />

Elec = Feed x FeedElec<br />

/ No. <strong>of</strong> hours for<br />

processing per day<br />

Is j between<br />

stated times ?<br />

Figure 6.1 Gasification and Pyrolysis Feedstock Availability Algorithm<br />

No<br />

No<br />

No

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!