2842_LVIA<br />

111<br />

September 2011<br />

GALLOPER WIND FARM SUBSTATION<br />

11.0 Assessment at Year 15<br />

11.1. Landscape Effects at Year 15<br />

Effects of Onshore Cable Connection at Year 15<br />

11.1.1. At Year 15 the only visible features will be the transmission pits<br />

which will comprise up to four underground pits each with 2 x 5m<br />

wide hard surfacing flush with ground level, enclosed by a post and<br />

rail fence. Landscape effects of the onshore cable connection at Year<br />

15 will be Negligible.<br />

Effects of the Substation and Connection to the <strong>National</strong> Grid at<br />

Year 15<br />

Magnitude of Effect on Landscape Character around the Site<br />

11.1.2. At Year 15 mitigation planting associated with GWF and GGOWF<br />

will have matured and will help to screen the development from the<br />

landscape, as discussed in sections 7.0 and 13.0. The new woodland to<br />

the north, west and south, planted on the proposed landform, will<br />

appear as part of Sizewell Wents woodland, and screen all but the<br />

tallest structures within the substation compounds.<br />

11.1.3. The planting would reduce the magnitude of effect on landscape<br />

character within the land around the site as described below.<br />

11.1.4. The proposed development with the ‘additional mitigation area'<br />

discussed in section 8.1.1 would lead to similar effects on landscape<br />

character as those assessed without the ‘additional mitigation area'.<br />

While the landform with the ‘additional mitigation area’ would be<br />

slacker and tie into the existing landform north of Sizewell Gap road<br />

more gradually, the extent, magnitude and significance of effects on<br />

landscape character would be similar with or without the additional<br />

landform. The effects of the proposals with and without the<br />

‘additional mitigation area’ are, therefore, not specifically discussed