2842_LVIA<br />

16<br />

September 2011<br />

GALLOPER WIND FARM SUBSTATION<br />

Consultation on Preliminary Environmental Report<br />

2.3.4. A Preliminary Environmental Report (PER) on the offshore and<br />

onshore aspects of the project and its likely environmental impacts<br />

was published in June 2011, to inform the statutory pre-application<br />

consultation under Section 42 of the <strong>Planning</strong> Act 2008. The aim of<br />

the statutory consultation was to inform relevant stakeholders and<br />

those with an interest in the application about the project and its<br />

impacts, and to receive their comments. The results of the<br />

consultation were used to inform the design of the proposals, the<br />

Environmental Statement (ES) and those aspects of the project which<br />

had yet to be finalised.<br />

2.3.5. The proposals presented in the PER showed an envelope of potential<br />

developed area with little mitigation. The comments received were<br />

used to inform further scheme design, which is the subject of the<br />

scheme assessed in this LVIA. A full schedule of consultation<br />

responses and how they have been addressed is included in the ES.<br />

The main responses relevant to landscape and visual issues are<br />

summarised below.<br />

Design and mitigation<br />

� Current mitigation proposals (as presented in the PER) are<br />

inadequate to screen the substation;<br />

� Importance of providing sufficient and appropriate landscaping<br />

and minimising landscape and visual impacts due to the location<br />

of the substation in an AONB;<br />

� The Development Consent Order (DCO) should contain details of<br />

slab levels, proposed screen bund cross sections, approximate<br />

arrangements of significant elements of substation buildings and<br />

equipment and key landscape mitigation;<br />

� Lower slab level;<br />

� Increase bund/planting and screening;