2842_LVIA<br />

September 2011<br />

GALLOPER WIND FARM SUBSTATION<br />

thus gives an indication of the likelihood of unacceptable effects on<br />

those receptors.<br />

17.1.16. A description of how sensitivity is assessed for each receptor type is<br />

included below. It is usually rated on the following scale (though the<br />

wording may be altered at the request of the EIA coordinator):<br />

� High – material effects are likely to arise from a development of<br />

this nature.<br />

� Medium – material effects may arise from a development of this<br />

nature.<br />

� Low - material effects are unlikely to arise from a development of<br />

this nature.<br />

17.1.17. Magnitude of effect is assessed for all receptors and identifies the<br />

degree of change. It is rated on the following scale:<br />

� High – total or major alteration to key elements, features or<br />

characteristics, such that post development the baseline situation<br />

will be fundamentally changed.<br />

� Medium - partial alteration to key elements, features or<br />

characteristics, such that post development the baseline situation<br />

will be noticeably changed.<br />

� Low - minor alteration to key elements, features or<br />

characteristics, such that post development the baseline situation<br />

will be largely unchanged despite discernible differences.<br />

� Negligible – very minor alteration to key elements, features or<br />

characteristics, such that post development the baseline situation<br />

will be fundamentally unchanged with barely perceptible<br />

differences.<br />

17.1.18. Whilst the duration of effects is also a consideration, the normal<br />

lifespan of a wind farm (and therefore its substation), though<br />

temporary, is a period of 25 years. This is a considerable length of time<br />

and so is not taken into account in determining magnitude. The