2842_LVIA<br />

65<br />

September 2011<br />

GALLOPER WIND FARM SUBSTATION<br />

different locations at different times.<br />

8.3.2. The wind farm’s operational life is defined (by The Crown Estate) as<br />

up to 25 years. An additional two years would be granted to the lease<br />

to allow decommissioning to take place. All elements of the wind<br />

farm would be designed with a minimum operational life of 25 years.<br />

Following this a decision would be made on whether the operating<br />

company wish to proceed with decommissioning or apply to the<br />

relevant Regulatory Authority at the time, to repower the wind farm.<br />

This LVIA addresses effects of the 32 month construction phase, a 25<br />

year operational phase and a 2 year decommissioning phase.<br />

8.4. Decommissioning<br />

8.4.1. A full Decommissioning Plan for the project would be drawn up and<br />

agreed with the Department for Energy and Climate Change (DECC)<br />

before construction commences. For the purpose of this assessment it<br />

has been assumed that:<br />

� export cables between the landfall and the substation site will be<br />

disconnected and left in situ in order to reduce environmental<br />

impacts, unless otherwise advised by the relevant planning<br />

authority;<br />

� any equipment installed within the onshore transition pit will<br />

remain in situ, unless otherwise advised by the relevant planning<br />

authority;<br />

� the substation development will be dismantled and removed<br />

from site;<br />

� hard standing areas will be broken up and the associated wastes<br />

removed from site;<br />

� the profiled landform, woodland and other planting will be<br />

retained unless otherwise advised by the relevant planning<br />

authority; and