2842_LVIA<br />

September 2011<br />

GALLOPER WIND FARM SUBSTATION<br />

routes. Other publicly accessible locations such as permissive rights<br />

of way, open access land, Woodland Trust sites or similar are also<br />

considered, although it should be borne in mind that these do not<br />

have the protection which is afforded to PROW.<br />

Distances<br />

17.1.38. Where distances are given in the assessment, these are approximate<br />

distances between the development site and the nearest part of the<br />

receptor in question, unless explicitly stated otherwise.