2842_LVIA<br />

138<br />

September 2011<br />

GALLOPER WIND FARM SUBSTATION<br />

� Viewpoint 2 on the bridleway approximately 0.13km to the<br />

north of the site. The changes are mainly due to the extent of new<br />

woodland that will be visible across part of an existing open<br />

skyline. The visual effects are assessed as Major-Moderate<br />

significance. On balance it is considered that the changes will be<br />

Neutral as the existing pylons will be screened but it is possible<br />

that some substation structures will be visible above trees. In the<br />

longer term, as trees continue to grow, it is likely that all<br />

substation structures will become screened.<br />

� Viewpoint 4 on Sizewell Gap road to the east of the site (also part<br />

of the Sandlings Walk) where the development and new<br />

woodland will be seen on the skyline, albeit in the context of<br />

existing infrastructure. The visual effects are assessed as Major-<br />

Moderate significance. The effects will be Adverse.