2842_LVIA<br />

64<br />

September 2011<br />

GALLOPER WIND FARM SUBSTATION<br />

Transmission compound<br />

8.2.3. This assessment is based on there being no lighting as the<br />

transmission compound is unmanned. Lighting will be installed for<br />

use during planned/emergency maintenance. Automatic security<br />

lighting will be installed at the gate area and control building. Other<br />

lights will be manually operated.<br />

8.2.4. <strong>National</strong> Grid will agree a detailed design which will include a plan of<br />

lighting arrangements with the Local <strong>Planning</strong> Authority<br />

Sealing end compounds<br />

8.2.5. This assessment is based on there being no lighting as the sealing end<br />

compounds are unmanned. Lighting will be installed for use during<br />

planned/emergency maintenance.<br />

8.2.6. No lighting such as aircraft warning lights will be installed on the<br />

gantries.<br />

Construction<br />

8.2.7. Lighting will be required during the construction period. In general<br />

work will be restricted to take place from 7am - 8pm and temporary<br />

lighting may be required for any activity during this time. Specific<br />

activities may require lighting outside this time period if they are<br />

occurring during winter or into the evening and it's a requirement to<br />

continue the activity, e.g. continuous concrete pours, cable landfall,<br />

horizontal directional drilling or commissioning of electrical<br />

equipment.<br />

8.3. Programme<br />

8.3.1. Onshore, the construction programme will be up to five years but this<br />

will not be five years of intensive construction activities. Peak<br />

activities will be spread through the five year period and be in