22.02.2013 Views

Galloper Wind Farm Project - National Infrastructure Planning

Galloper Wind Farm Project - National Infrastructure Planning

Galloper Wind Farm Project - National Infrastructure Planning

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2842_LVIA<br />

56<br />

September 2011<br />

GALLOPER WIND FARM SUBSTATION<br />

6.0 Potential for Cumulative Effects<br />

6.1.1. The following proposals could potentially be included for cumulative<br />

LVIA:<br />

1) Sizewell C. No proposals are currently available for Sizewell C<br />

and it is, therefore not possible to include in a meaningful<br />

cumulative assessment. However, there is a ‘nominated site area’<br />

and consultees have requested that potential cumulative effects<br />

with Sizewell C are discussed in the LVIA;<br />

2) Sizewell B dry fuel store. This proposed development lies within<br />

the existing Sizewell footprint, screened from the landscape. The<br />

LVIA prepared by Gillespies for British Energy for that<br />

development assesses impacts to be negligible - there will<br />

therefore be no significant cumulative effects with <strong>Galloper</strong><br />

wind farm substation; and<br />

3) GGOWF substation. GGOWF is part of the existing baseline for<br />

the LVIA of GWF. It is, therefore, not assessed as a separate<br />

cumulative development.<br />

6.1.2. A discussion on potential cumulative effects of GWF with Sizewell C<br />

is given in section 15.0. Cumulative effects with Sizewell B dry fuel<br />

store and GGOWF substation are not assessed for reasons given above.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!