2842_SLVIA<br />

91<br />

8.0 Cumulative Effects<br />

8.1. Introduction<br />

8.1.1. As detailed in Appendix 1, the potential cumulative effects arising from the<br />

proposed GWF will be confined to an area within which one or more<br />

operational, consented or ‘in planning’ offshore or onshore wind farm is<br />

located within 30-35km of a coastal receptor and within the 45km radius<br />

study area for the proposed GWF. As such, this section does not consider the<br />

magnitude or significance of the effects arising from the individual<br />

cumulative wind farm developments, but instead looks at the additional<br />

seascape, landscape and visual effects arising from the combination of WTGs<br />

of the proposed GWF with one, or more, of the identified offshore and/or<br />

onshore wind farms.<br />

8.2. Assessment Scenarios and Methodology<br />

8.2.1. As detailed in Section 2.2, there are currently three operational offshore wind<br />

farms and three consented offshore wind farms located within the study area.<br />

These comprise the operational Gunfleet Sands I & II offshore wind farms;<br />

the operational offshore wind farm at Thanet; the consented GGOWF; and<br />

the consented offshore wind farms at London Array (I and II).<br />

8.2.2. As all of the above wind farms are either operational or consented, their<br />

influences on the existing landscape resource, seascape character and visual<br />

environment of the study area has been considered as part of the baseline of<br />

this assessment. At the time of assessment (May 2011) many of the GGOWF<br />

and London Array I WTGs were in place.<br />

8.2.3. In addition, an extension to Gunfleet Sands is in planning. It forms a two<br />

WTG extension to Gunfleet Sands I and II and the Gunfleet Sands I and II<br />

wind farms would lie between the extension and the GWF. It lies further<br />

than 45km from GWF. The cumulative effects of the Gunfleet Sands<br />

Extension windfarm and GWF will be Negligible and have not been<br />

considered as part of the cumulative assessment.<br />

8.2.4. Due to the distance of the operational Thanet wind farm from the coastal<br />

receptors identified in the study area, the cumulative effects of the proposed<br />

GWF in combination with the Thanet offshore wind farm have not been<br />

considered as part of the cumulative assessment for onshore receptors.<br />

8.2.5. Due to the distance of East Anglia ONE site from the coastline<br />

(approximately 45km) the cumulative effects of this development are not<br />

assessed for onshore receptors. In accordance with the method in Appendix<br />

1, only those wind farm projects which are within 30 - 35km of a coastal