2842_LVIA<br />

59<br />

September 2011<br />

GALLOPER WIND FARM SUBSTATION<br />

the site - north of Sizewell Gap road, east of Lover’s Lane, south of<br />

Sandy Lane and west of the woodland west of Sizewell. It is notable<br />

that the proposed woodland planting is likely to completely screen<br />

the substation from the rural land up to almost 0.5km to the south,<br />

west and north. Planting will also reduce areas with visibility of the<br />

substation and gantries from areas beyond this. It should be borne in<br />

mind, however, that mitigation planting will be screening many of<br />

the lower elements within the substation and it might be that only<br />

the tops of the tallest structures (e.g. the tallest buildings) are actually<br />

visible at Year 15 from areas where no change in visibility is shown.<br />

This is confirmed by examining the photomontage views at Years 1<br />

and 15.<br />

7.1.12. Site assessment identifies that actual visibility is much less than<br />

indicated on Figures 06 and 07. There are many small scale features<br />

including trees and hedgerows present in the landscape that reduce<br />

visibility further than indicated on the ZTV plans.