2842_LVIA<br />

73<br />

September 2011<br />

GALLOPER WIND FARM SUBSTATION<br />

Ancient Estate Claylands<br />

9.1.21. The construction works will potentially be visible from within<br />

localised areas of this character type, approximately 2.5km and<br />

further from the site. Field assessment has identified that, in reality,<br />

visibility will be very limited. Viewpoint 8 represents a ‘worst case’<br />

view from a publically assessable location within this area. The<br />

magnitude of effect on receptors represented at viewpoint 8 is<br />

considered to be Negligible (see section 9.3). Very occasional<br />

Negligible effects on views from this landscape character type would<br />

result in effects of Negligible magnitude and Negligible significance<br />

during construction.