2842_LVIA<br />

80<br />

September 2011<br />

GALLOPER WIND FARM SUBSTATION<br />

by the elevated nature of the landform to the south of the road. There<br />

will, however, be open, oblique views towards the construction of the<br />

cable corridor along its extents to the north of the Sizewell Gap road<br />

available to motorists and pedestrians travelling along this road.<br />

9.3.15. During construction the existing woodland belt to the north and east<br />

of Lover’s Lane and Sizewell Gap road is of sufficient height to<br />

effectively screen views towards the proposed substation along most<br />

of the length of these roads (see for example Viewpoint 7). Where a<br />

gap opens up in the roadside vegetation along Sizewell Gap road to<br />

the south of the site, the temporary laydown and accommodation<br />

areas, and construction works, will be visible. Removal of trees<br />

within Sizewell Wents will open up a gap in the woodland, which<br />

will be most visible from a section of Sizewell Gap road to the southeast<br />

of the site.<br />

9.3.16. Views of the construction works from more distant roads will be<br />

limited by roadside hedgerows, and other vegetation and<br />

development in the landscape.<br />

9.3.17. The effects of the proposed development on the travelling public will<br />

be similar with or without the ‘additional mitigation area’ discussed<br />

in section 8.1.1. While construction of the additional landform will<br />

be visible from Sizewell Gap road it will make little difference to<br />

effects on this receptor as the additional landform covers land that<br />

will already be occupied by temporary laydown and accommodation<br />

areas.<br />

Visitors and the Tourism/Amenity Resource<br />

9.3.18. There may be partial views towards the construction of the onshore<br />

cable connection and substation from Cliff House Caravan Park to the<br />

southeast.<br />

9.3.19. Whilst there are no views towards the construction works associated<br />

with the proposed substation available from Sizewell Beach, visitors