2890_mitigation<br />

2890_mitigation<br />

August 2011<br />

<strong>Galloper</strong> <strong>Wind</strong> <strong>Farm</strong> Substation<br />

Contents<br />

1.0 Introduction ............................................................................................................................................................... 1<br />

1.1. Report Structure ............................................................................................................................................. 2<br />

2.0 Baseline ........................................................................................................................................................................ 3<br />

3.0 Principles of Mitigation ....................................................................................................................................... 11<br />

4.0 Proposals.................................................................................................................................................................... 13<br />

4.1. Agreement of the landscape mitigation strategy with SCDC, SCC and EDF ....................... 13<br />

4.2. Proposals submitted with the Development Consent Order ..................................................... 15<br />

4.3. Profiled landform around substation .................................................................................................. 15<br />

4.4. Sizewell Wents wood ................................................................................................................................. 16<br />

4.5. Cable corridors, cable sealing compounds and gantries .............................................................. 16<br />

4.6. Hedgerows ...................................................................................................................................................... 17<br />

4.7. Fields ................................................................................................................................................................. 17<br />

4.8. Woodland and hedgerow planting mixes ......................................................................................... 17<br />

5.0 Additional Mitigation Area ................................................................................................................................ 19<br />

Appendices<br />

Appendix 1. Sizewell Estate Integrated Land Management Plan Map 6 Land Use/Habitat<br />

Appendix 2. Maximum Heights of GWF Substation drawing GWF_583_R1<br />

Appendix 3. Correspondence with SCDC, SCC and EDF regarding the agreed Landscape<br />

Mitigation Strategy<br />

Appendix 4. Drawings<br />

Appendix 5. Drawing 25456/003/100A showing landform without the ‘additional<br />

mitigation area’<br />

Appendix 6. Drawing 25456/003/101A 100A showing landform with the ‘additional<br />

mitigation area’