GALLOPER WIND FARM SUBSTATION<br />

15.0 Cumulative Effects<br />

15.1.1. As indicated in section 6.0, one potential source for cumulative effects<br />

has been identified and considered. Sizewell C is one of the sites<br />

nominated by the Department of Energy and Climate Change for a<br />

new nuclear power station. There is no information available on the<br />

proposed layout.<br />

15.1.2. EDF Energy has nominated a site which is included in the recently<br />

published <strong>National</strong> Policy Statement for Nuclear Power Generation<br />

(EN-6) (Department for Energy and Climate Change, July 2011) (see<br />

Figure SSA/SX/001 Rev 01 in Appendix 5). This shows two parts of the<br />

nominated site area, a larger area to the north (1km and more from<br />

the site of the proposed GWF substation) and a second smaller area<br />

adjacent to the site of the proposed substation, in the field<br />

immediately east of Sandy Lane. EDF’s site nomination report<br />

(Strategic Siting Assessment for the Development of New Nuclear<br />

Power Stations in the UK. Site Nomination Report for: Sizewell. EDF<br />

Energy 30.03.09) states that ‘The nominated site includes a secondary<br />

area to the south of Sizewell A and B power stations, between Sizewell<br />

Wents and the hamlet of Sizewell. This area has been identified<br />

because it may be needed to accommodate ancillary facilities to meet<br />

operational requirements.’ (Section 1.1). No further information is<br />

provided on the use of this area.<br />

15.1.3. The main part of the Sizewell C will lie north of the existing power<br />

station with a new access road connecting to the existing road<br />

network to the north-west. This area lies approximately 1km or more<br />

from the site of the proposed GWF substation. The existing Sizewell<br />

Power Station lies closer to the proposed substation, within<br />

approximately 0.5km.<br />

15.1.4. As discussed in section 3.2, in July 2011 six <strong>National</strong> Policy<br />

Statements (NPS) for Energy were designated under the <strong>Planning</strong> Act<br />

2008. The energy NPSs set out national policy against which<br />

proposals for major energy projects will be assessed and decided on by