2890_mitigation<br />

19<br />

August 2011<br />

<strong>Galloper</strong> <strong>Wind</strong> <strong>Farm</strong> Substation<br />

5.0 Additional Mitigation Area<br />

There is potential for an ‘additional mitigation area’ to be available to utilise additional<br />

spoil generated during construction of the substation, to create slacker slopes on the<br />

southern side of the landform. The landform without the ‘additional mitigation area’,<br />

on which the proposals described and illustrated in Section 4.0 above, and on<br />

Drawings 2890/07H and 2890/12 in Appendix 4, is shown on Drawing 25456/003/100A<br />

in Appendix 5. The landform with the ‘additional mitigation area’ is shown on<br />

Drawing 25456/003/101A in Appendix 6.<br />

The effects of the proposals with and without the ‘additional mitigation area’ are<br />

assessed in the LVIA.