22.02.2013 Views

Galloper Wind Farm Project - National Infrastructure Planning

Galloper Wind Farm Project - National Infrastructure Planning

Galloper Wind Farm Project - National Infrastructure Planning

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2842_SLVIA<br />

9<br />

Table 2: Consultation with Suffolk Coastal District Council and<br />

Natural England in 2009<br />

Consultees Date of<br />

Consultation<br />

Suffolk Coastal<br />

District Council<br />

(SCDC)<br />

Natural England<br />

(NE)<br />

4 th November<br />

2009<br />

21 st December<br />

2009<br />

4 th November<br />

2009<br />

17 th<br />

November<br />

2009<br />

7 th December<br />

2009<br />

15 th December<br />

2009<br />

21 st<br />

December<br />

2009<br />

21 st<br />

December<br />

2009<br />

Type of<br />

Consultation<br />

Letter enclosing<br />

methodology,<br />

viewpoints and ZTV<br />

Purpose of<br />

Consultation<br />

Seeking agreement<br />

on study area,<br />

methodology,<br />

viewpoints and<br />

cumulative sites<br />

Email from SCDC Agreement to the<br />

consultation<br />

Letter enclosing<br />

methodology,<br />

viewpoints and ZTV<br />

Seeking agreement<br />

on study area,<br />

methodology,<br />

viewpoints and<br />

cumulative sites<br />

Email from NE Questions<br />

concerning the<br />

above<br />

Email to NE Response to<br />

questions<br />

concerning the<br />

above<br />

Email from NE Further questions<br />

Email to NE Response to<br />

questions<br />

concerning the<br />

above<br />

Email from NE Agreement to the<br />

consultation<br />

2.4.3. In 2011 the proposals for the wind farm were revised with the potential<br />

maximum height of the WTGs to blade tip having increased from 170 to

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!