2842_LVIA<br />

79<br />

September 2011<br />

GALLOPER WIND FARM SUBSTATION<br />

9.3.9. The property of Home <strong>Farm</strong> (44 on Figure 05), situated to the south of<br />

the Sizewell Gap road, will have an open view across gently<br />

undulating field towards the construction of the onshore cable<br />

connection route and substation.<br />

9.3.10. Some of the properties north of Sandy Lane (10-16, 32 and 47 on<br />

Figure 05) will have oblique views of the construction of the proposed<br />

substation through or between vegetation in gardens or lining the<br />

lane. The vegetation partially or completely obscures views from<br />

some of these properties.<br />

9.3.11. 1 and 2 Rosery Cottages (30 and 31 on Figure 05) might have views of<br />

the construction works associated with the gantries and cable<br />

connections to them, from the fronts of the properties, seen in the<br />

context of the existing much larger pylons. However, it is possible<br />

that intervening vegetation along the bridleway will obscure these<br />

views. The construction of the northern cable corridor from the<br />

proposed substation to the gantries will require the removal of<br />

woodland on the northeast and east sides of the existing GGOWF<br />

substation and it is possible that this will open up views of the<br />

substation from the properties.<br />

9.3.12. The effects of the proposed development on residential receptors will<br />

be the same with or without the ‘additional mitigation area’ discussed<br />

in section 8.1.1.<br />

9.3.13. The residential amenity of residential properties would not be<br />

unacceptably harmed by the construction of the substation or<br />

onshore cable connection to their view.<br />

Travelling Public<br />

9.3.14. During the construction phase, views towards the onshore cable<br />

connection route to the south of the Sizewell Gap road will be<br />

partially screened, and in places wholly screened, from local road<br />

users by the outgrown medium hedgerows aligning the road and also