2842_LVIA<br />

63<br />

September 2011<br />

GALLOPER WIND FARM SUBSTATION<br />

8.2. Lighting<br />

GWF compound (the westerly compound)<br />

8.2.1. A detailed permanent lighting plan for the GWF compound element<br />

of the substation will be produced during the design phase in line<br />

with the following principles unless otherwise agreed with the local<br />

planning authority:<br />

� lighting will not be turned on unless personnel are present on<br />

site;<br />

� the substation is unmanned therefore the default lighting option<br />

will be no lighting;<br />

� lighting may be required during planned and emergency<br />

maintenance operations;<br />

� where feasible, planned maintenance operations will be carried<br />

out between the hours of 8am and 6pm;<br />

� lighting will generally be downward pointing to minimise sky<br />

glow;<br />

� automatic low level lighting will be incorporated at the access<br />

gate and control building; and<br />

� no lighting will be installed on the access route except at the<br />

access gate.<br />

8.2.2. There will, therefore, be no lights on for most of the time during<br />

operation. When people are present during the hours of darkness<br />

lighting will be on for operational purposes and will be designed to<br />

minimise light pollution. Effects of lighting from the GWF<br />

compound during operation will, therefore, be minimal and is not<br />

referred to in the LVIA.