22.03.2013 Views

OP-755 Part 2 Pages 197-401 - Personal Page of GENE SLOVER

OP-755 Part 2 Pages 197-401 - Personal Page of GENE SLOVER

OP-755 Part 2 Pages 197-401 - Personal Page of GENE SLOVER

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

326<br />

143. To reassemble the brake band assembly. - The brake<br />

band assembly is to be reassembled in reverse <strong>of</strong> the dismantling<br />

instructions. Extreme care must be exercised to prevent<br />

oil or grease from getting onto the brake band or brake drum<br />

while reassembling the parts. The brake is to be adjusted as<br />

prescribed i~ paragraph 85.<br />

144. To remove the relief valves from the B-end motor<br />

head, loosen the acorn nuts 274311-2 and the lock nut 274319-3.<br />

Back out the adjusting screw 274324-5, and the relief valves<br />

and springs 274312-6 and 274312-3 can be removed. After the<br />

parts have been 'cleaned and reassembled the relief valves are<br />

to be adjusted as prescribed in paragraph 84.<br />

145. To remove the c am housing assembly (dr . no. 274326-1).<br />

Block the powder car at the loading position to take the load<br />

<strong>of</strong>f the cable if the unit is assembled in the turret. Remove<br />

the earn support assembly as explained previously. Using the<br />

bearing lock nut wrench 274346-2, which may be found in the<br />

spare parts box #1, loosen the lock nut 274339-6 on the drive<br />

shaft 274314-1. Next remove the gear 274328~6 and the spacer<br />

274335-6. Next remove the clamping screw 196825-7 from the<br />

upp er .end <strong>of</strong> the link 274335-8 .• which connects the rocker arm<br />

operating lever 274327-2 to the foot valve linkage (see dr.<br />

no. 274249). Drive out the link pin 274334-8. Loosen the two<br />

lock nuts' 274339-8 on the control rod 274330-3, which connects<br />

the B-endto the control linkage, (dr . no. 274251). Remove<br />

the screw 274272-5 from the upper end <strong>of</strong> the link 274253-4,<br />

which connects the control rod 274330-3 to the lever 274253-1<br />

on the control linkage. Next screw the control rod 274330-3<br />

out <strong>of</strong> the clevis 274253-5 at the B-end. Remove the eight<br />

mounting screws 229123-7 from the mounting face <strong>of</strong> the earn<br />

housing 274326-1 and drive out the dowel pins 274319-4. The<br />

earn housing can now be slid along the mounting base until it<br />

clears the drive shaft and can be removed. As this is a heavy<br />

assembly a chain fall or block and tackle should be used' for<br />

ease in handling.<br />

146. To dismantle the cam housing (dr. no. 274326-1). -<br />

The rocker arm assembly is to be removed as explained previously,<br />

which will permit the rocker arm shaft to be slipped out <strong>of</strong><br />

the bearings 274337-9 and the oil seal 274338-10. Next remove<br />

the small cover 274321-5, and loosen the lock nut 271665-7.<br />

Tapping on the end <strong>of</strong> the shaft 274324-3 will force the shaft<br />

out <strong>of</strong> the gear 274327-1, and the outer bearing 196827-9. The<br />

shaft 274324-3, assembled to the inner bearing 196827-9, and<br />

the gear 274328-9 can be removed. Loosen the key 200148-6 and<br />

the gear and bearing can be forced <strong>of</strong>f the shaft 274324-3.<br />

Next remove the large cover 274324-2, and the oil seal 274338-8<br />

and the bearing 274337-11 can be removed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!