22.03.2013 Views

OP-755 Part 2 Pages 197-401 - Personal Page of GENE SLOVER

OP-755 Part 2 Pages 197-401 - Personal Page of GENE SLOVER

OP-755 Part 2 Pages 197-401 - Personal Page of GENE SLOVER

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CAM ROLLER CLEARANCE<br />

SHORT CAM LINK ----l:A--J<br />

B<br />

214<br />

CONTROL CAM<br />

o o<br />

LONG CAM LINK<br />

Fig. 39 - Projectile Ring Adjustments<br />

26. Control valve adjustment. - The control adjustment<br />

prescribed below, although not critical, should be maintained<br />

in order to obtain best results. The adjustment is located<br />

at point "B!1 as indicated on figure 39. The desired clearance<br />

is .005 inch between the adjusting screw <strong>of</strong> the valve plunger<br />

and the latch as shown on figure 40.<br />

Loosen nut 200022-11 with the latch held in the bottom<br />

<strong>of</strong> notch on the control valve cam and with plunger<br />

271700-2 held in its up position by valve 271700-6<br />

and spring 271700-4, rotate adjusting screw 271702-3<br />

until the desired setting is obtained.<br />

27. Cam roller link adjustment. - The cam roller link<br />

adjustment is located at point "C n as indicated on figure 39.<br />

The details <strong>of</strong> this linkage are shown in figure 41. The clearances<br />

shown on the latter figure provide for normal pump <strong>of</strong>fset<br />

to start the ring rotating.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!