22.03.2013 Views

OP-755 Part 2 Pages 197-401 - Personal Page of GENE SLOVER

OP-755 Part 2 Pages 197-401 - Personal Page of GENE SLOVER

OP-755 Part 2 Pages 197-401 - Personal Page of GENE SLOVER

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

.250<br />

(f) Before operating the hoist under projectile<br />

loads verify adequacy <strong>of</strong> rack paid and tube pawl<br />

lubrication.<br />

(g) Electric motor direction rotation. - If either<br />

power unit is new, or has been disassembled,<br />

or if any lead to either motor or controller<br />

has been discormected, it is imperative to<br />

verify the motor direction <strong>of</strong> rotation before<br />

operating. This is particularly importa:p.twith<br />

respect to the cradle operating motor as the<br />

two vane type pumps driven by that unit will<br />

be damaged if reversed.<br />

(h) Pressure tests. - Gauge checks should be performed<br />

quarterly to verify correct pressures<br />

in the pawl operating circuits.<br />

42. Hydrau l t c 0 t l . - The hydraulic oil to be used in<br />

both the main system and the cradle operating system is that<br />

specified in O.S. 1113. Whenreplacing or when replenishing<br />

oil pour through a fine meshwire strainer <strong>of</strong> at least 120 wires<br />

to the inch. Newassemblies should be drained after fLf teen<br />

hours operation and should then be thoroughly flushed clean<br />

and refilled with fresh oil or carefully salvaged oil. Perform<br />

test inspection and analysis <strong>of</strong> oil sample from each system<br />

monthly. If there 1S evidence <strong>of</strong> sludge, water or acidity,<br />

drain, flush and refill with fresh oil-. The amount <strong>of</strong> oil required<br />

to fill each cradle operating system (including the powder<br />

hoist upper door circuit) is 35 gallons. The system is<br />

self venting. The amount <strong>of</strong> oil required to fill the main hoist<br />

system is 25 gallons. This circuit requires venting at the<br />

needle valve in ·the upper cylinder head.<br />

43. BUffer fluid. - The liquid to be used in the cradle<br />

buffer is recoil cylinder liquid as specified in the latest<br />

revision <strong>of</strong> O.D. 1914.<br />

44. Lub r i c a t ion. - All projectile hoist assemblies must<br />

be lubricated with the lubricants and according to the frequencies<br />

specified on the lubrication chart.<br />

45. Bx er c i se checks. - Exercise each cradle operating<br />

assembly including the pawl control mechanisms at least once<br />

weekly. The operation must include check <strong>of</strong> response action<br />

to verify normal functioning <strong>of</strong> all control, indicatcr and pawl<br />

operating devices.<br />

46. Installation and<br />

overhauling or servicing the<br />

instructions <strong>of</strong> chapter XV.<br />

maintenance. - Wheninstalling,<br />

hydraulic units comply with the

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!