22.03.2013 Views

OP-755 Part 2 Pages 197-401 - Personal Page of GENE SLOVER

OP-755 Part 2 Pages 197-401 - Personal Page of GENE SLOVER

OP-755 Part 2 Pages 197-401 - Personal Page of GENE SLOVER

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

222<br />

yoke completely over. If operation is<br />

possible remove main pump and hydraulic<br />

motor and check for scoring by foreign<br />

matter.<br />

Mechanical bind.<br />

Check drive worm for excessive torque<br />

by manual operation, then disconnect coupling<br />

and rotate drive shaft. If in unit<br />

check worm gearing for foreign matter and<br />

the mechanical brake for binding condition.<br />

40. Improper acceleration or deceleration. - Faulty<br />

starting and stopping action may be caused to a limi ted degree<br />

for the same reasons as are cited in paragraph 39. Such improper<br />

action may also be due to one <strong>of</strong> the replenishing check<br />

valves being stuck in a partly open position.<br />

41. Rotation cycle i.mc omp t e t:e . - An incompleted cycle<br />

can be caused by the same conditions cited in paragraph 40 or<br />

by incorrect adjustment <strong>of</strong> the control valve. Check the latter<br />

against the prescribed adjustment <strong>of</strong> paragraph 26.<br />

42. Failure to stop at station. - If the linkage is<br />

properly adjusted the proj ectile ring will stop whenever operation<br />

lever is moved to neutral regardless <strong>of</strong> the position <strong>of</strong><br />

valves. However if operation lever is held in position for<br />

rotation the ring will not stop automatically, as intended,<br />

when the ring station is reached because <strong>of</strong> any or all <strong>of</strong> the<br />

following conditions:<br />

(a) Control valve stuck in depres sed position.<br />

Inspect and clean.<br />

(b) By-pass valve stuck in depressed position.<br />

Inspect and clean.<br />

(C) Interlock valve stuck in starting position.<br />

Inspect and clean.<br />

43. St opp i ng aut <strong>of</strong> phase. - If the proj ectile ring<br />

operates through 30 degree arcs <strong>of</strong> movementand stops but does<br />

not stop at ring stations, the equipment has been coupled out<br />

<strong>of</strong> phase. To correct this condition refer to the instructions<br />

<strong>of</strong> paragraph 34-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!