22.07.2013 Views

facilities renewal master plan - National Zoo - Smithsonian Institution

facilities renewal master plan - National Zoo - Smithsonian Institution

facilities renewal master plan - National Zoo - Smithsonian Institution

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FACILITIES MASTER PLAN ENVIRONMENTAL ASSESSMENT<br />

Figure 4. The No-Action Alternative<br />

D. Alternative A<br />

Alternative A (see Figure 5) would involve the development of large, multi-species<br />

exhibits throughout the <strong>National</strong> <strong>Zoo</strong>, distributing visitors evenly across the <strong>National</strong><br />

<strong>Zoo</strong>’s <strong>facilities</strong>. Entrances would be consolidated into three visitor service hubs. This<br />

would include revitalization of the existing Connecticut Avenue entry (1), the addition of<br />

a Mid-Point entry (2), and reworking of the Harvard Street Bridge/Beach Drive entry (3).<br />

The current Bus Lot (5) would be reclaimed for exhibit space. Two turnarounds along<br />

SMITHSONIAN INSTITUTION – NATIONAL ZOOLOGICAL PARK 21 | P a g e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!