facilities renewal master plan - National Zoo - Smithsonian Institution
facilities renewal master plan - National Zoo - Smithsonian Institution
facilities renewal master plan - National Zoo - Smithsonian Institution
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
FACILITIES MASTER PLAN ENVIRONMENTAL ASSESSMENT<br />
G. Alternative Concepts<br />
Figure 7. Alternative C<br />
This section provides more detailed information supported by illustrations for concepts<br />
being considered in Alternative A through Alternative C in this EA and the Master Plan,<br />
such as the Connecticut Avenue entry, mid-point entry, Harvard Street Bridge/ Beach<br />
Drive entry, aerial and road trams, Parking Lot C structure, and exhibit <strong>renewal</strong> at Beaver<br />
Valley. It should be noted that these are intended to be viewed as concepts for <strong>master</strong><br />
<strong>plan</strong>ning purposes. Additional <strong>plan</strong>ning, design, and engineering would occur to further<br />
define each concept.<br />
SMITHSONIAN INSTITUTION – NATIONAL ZOOLOGICAL PARK 30 | P a g e