Project: 826880 Norman Drive Traffic Calming<br />

Origination Year: 2007-08<br />

Planned Completion Year: 2010-11<br />

Department: Public Works<br />

Project Description / Scope / Purpose<br />

Project Information Sheet<br />

Type: Traffic & Transportation<br />

Category: Capital<br />

Project Manager: Jack Witthaus<br />

Fund: 385 Capital Projects<br />

Sub-Fund: 600 Gas Tax Funded<br />

Project Coordinator: Jack Witthaus<br />

This project will install traffic calming on Norman Drive on a permanent basis. Traffic calming has been installed on a temporary basis and will be evaluated for permanent installation in 2008. At<br />

the completion <strong>of</strong> the evaluation, <strong>City</strong> Council will be asked to consider approving and funding a permanent installation. The project is located on Norman Drive between Marion Way and El<br />

Camino Real. If the temporary project is shown to reduce speeds and volumes below the <strong>City</strong>'s traffic calming thresholds, then Council will be asked to approve and fund a permanent installation.<br />

The purpose <strong>of</strong> the project is to reduce the volume and speed <strong>of</strong> traffic on Norman Drive. The useful life <strong>of</strong> the project would be more than 20 years. The project would install a traffic circle at the<br />

intersection <strong>of</strong> Norman Drive and Bryant Way.<br />

Project Evaluation and Analysis<br />

This project has been conducted under the <strong>City</strong>'s Traffic Calming process. This is a community driven, collaborative process. This temporary implementation was agreed upon by staff, the<br />

Community and by <strong>City</strong> Council. The <strong>City</strong> has a policy to consider traffic calming on a case by case basis. Guidelines and criteria have been identified. This project meets these guidelines and will<br />

come before the <strong>City</strong> Council for consideration for permanent installation. If Council chooses not to fund the project, or to postpone it, the temporary traffic calming installation will be removed,<br />

and the street will function as it did pre-traffic calming.<br />

Fiscal Impact<br />

The total project construction and design cost for the project is $75,000. There will be a minor operating cost increase due to maintenance <strong>of</strong> the traffic circle which will be absorbed by the<br />

program. The project will not need to be replaced over the 20-year planning horizon.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

0 75,000 0 0 0 0 0 0 0 0 0 0<br />

0 75,000<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 75,000 0 0 0 0 0 0 0 0 0 0<br />

0 75,000<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Norman Drive Traffic Calming 826880