Project: 825111 Tertiary Plant Tank Drainage System Modifications<br />

Origination Year: 2003-04<br />

Planned Completion Year: 2010-11<br />

Department: Public Works<br />

Project Description / Scope / Purpose<br />

Project Information Sheet<br />

Type: Wastewater<br />

Category: Infrastructure<br />

Project Manager: Hira Raina<br />

Fund: 465 Wastewater Management Fund<br />

Sub-Fund: 300 Wastewater Infrastructure Subfund<br />

Project Coordinator: Joanna De Sa<br />

The tertiary plant tank drainage system at the Water Pollution Control Plant (WPCP) is used to drain chlorine contact tanks, fixed growth reactor tanks and air floatation tanks should any <strong>of</strong> these<br />

tanks need to be shut down for maintenance. The original drainage structure and pump station were built in 1975. The rate <strong>of</strong> drainage has noticeably slowed during the last couple <strong>of</strong> years, and it<br />

appears that some <strong>of</strong> the drainage piping is failing. The inability to drain these tanks quickly and efficiently for repairs compromises the <strong>City</strong>’s ability to meet all NPDES discharge requirements<br />

because tanks would be unavailable to provide treatment. In addition, since the production <strong>of</strong> recycled water has become a regular component <strong>of</strong> operations, the inability to quickly accomplish<br />

repairs also compromises the reliability <strong>of</strong> recycled water deliveries.<br />

This project encompasses both the study and the subsequent engineering design work. The design is complete. Bids have been received and the project has been awarded. Construction began in<br />

December 2008. Delays on construction may be incurred due to availability <strong>of</strong> structure during rainy season. Project should be completed by the end <strong>of</strong> FY 2008/09.<br />

Project Evaluation and Analysis<br />

This project addressed alternatives for repair/rehabilitation, based on conditions found and engineering alternatives available to accomplish same. Justification for the project is to fix an observed<br />

problem that if not corrected, could result in violations and fines, and possibly regulatory mandates for repair.<br />

Fiscal Impact<br />

This project will be funded from Wastewater Revenues. Operating costs will not be impacted significantly. The useful life <strong>of</strong> repairs is estimated to be 30 years.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

50,322 299,226 0 0 0 0 0 0 0 0 0 0<br />

0 349,548<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Tertiary Plant Tank Drainage System Modifications 825111

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!