Project: 825621 Wolfe Road Caltrain Overcrossing<br />

Origination Year: 2007-08<br />

Planned Completion Year: 2010-11<br />

Department: Public Works<br />

Project Description / Scope / Purpose<br />

Project Information Sheet<br />

Type: Traffic & Transportation<br />

Category: Infrastructure<br />

Project Manager: Mark Rogge<br />

Fund: 385 Capital Projects<br />

Sub-Fund: 980 Prop1B Trnsprtion Bond Local Strts & R<br />

Project Coordinator: Hira Raina<br />

This project is the result <strong>of</strong> the recommendations made in the biannual inspection by Caltrans. Caltrans is required under Title 23 <strong>of</strong> the Code <strong>of</strong> Federal regulations to inspect bridges and culverts<br />

every two years. The report dated July 12, 2004 recommends deck repair, replacement <strong>of</strong> the elastomeric bearing pads, and patching <strong>of</strong> the spalls in the superstructure (Caltrans bridge# 37C0776).<br />

Because the repairs recommended by Caltrans were not mandatory, funds were originally budgeted in FY 2010/2011 for design and FY 2011/2012 for construction.<br />

On April 23, 2008, Caltrain personnel notified the <strong>City</strong> that chunks <strong>of</strong> concrete had fallen from the bridge onto the railroad tracks below. Although the immediate concern was alleviated swiftly, the<br />

structural consultant hired to inspect the bridge recommended moving design and construction up to complete within 6 months, before the next winter.<br />

An additional $1.6M <strong>of</strong> project costs budgeted in FY 2009/10 reflects the costs to complete the $3.7M project estimate including $100,000 <strong>of</strong> Caltrain permitting expenses.<br />

Project Evaluation and Analysis<br />

The deck repair will extend the life <strong>of</strong> the structure and reduce possible extensive damage to the bridge. The replacement <strong>of</strong> the failed elastomeric bearing pad will level the bridge and improve the<br />

bridge to handle seismic activity.<br />

Fiscal Impact<br />

This project will be funded by federal stimulus transportation fund monies and the <strong>City</strong>'s State Proposition 1B Infrastructure Bond Funds first allocation.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

415,975 1,291,363 0 0 0 0 0 0 0 0 0 0<br />

0 1,707,338<br />

415,975 1,225,835 0 0 0 0 0 0 0 0 0 0<br />

0 1,641,810<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Wolfe Road Caltrain Overcrossing 825621