Project Information Sheet<br />

Project: 827010 Water Pollution Control Plant Primary Ro<strong>of</strong> Replacement<br />

Origination Year: 2007-08<br />

Planned Completion Year: 2010-11<br />

Department: Public Works<br />

Project Description / Scope / Purpose<br />

Type: Wastewater<br />

Category: Capital<br />

Project Manager: Hira Raina<br />

Fund: 465 Wastewater Management Fund<br />

Sub-Fund: 200 Wastewater Capital Subfund<br />

Project Coordinator: Dan Hammons<br />

This project provides funding to replace the four ro<strong>of</strong>s <strong>of</strong> the primary building at the Water Pollution Control Plant (WPCP). The existing ro<strong>of</strong>s are past their useful life, they are in need <strong>of</strong><br />

replacement before they fail. Ro<strong>of</strong>s at the WPCP typically have a useful life <strong>of</strong> 15 years. Staff estimates the current life <strong>of</strong> the existing ro<strong>of</strong>s to be more than 20 years old. This project was included<br />

with Project 801101, "WPCP Air Conditioning Project", due to time <strong>of</strong> the replacement and major HVAC renovations taking place. The project is expected to be bid in early 2009 and complete in<br />

summer 2009.<br />

Project Evaluation and Analysis<br />

The Water Pollution Control Plant building houses extensive electronic and electrical equipment, primary sewage pump engines along with <strong>of</strong>fices and conference rooms. Failure <strong>of</strong> the ro<strong>of</strong> could<br />

cause damage to expensive and critical equipment. Maintenance <strong>of</strong> this ro<strong>of</strong> is imperative to protect our investment.<br />

Fiscal Impact<br />

This project will be funded by the Wastewater Management Fund.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

10,046 199,954 0 0 0 0 0 0 0 0 0 0<br />

0 210,000<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Water Pollution Control Plant Primary Ro<strong>of</strong> Replacement 827010