23.07.2013 Views

ADOPTED BUDGET RESOURCE ALLOCATION PLAN - City of ...

ADOPTED BUDGET RESOURCE ALLOCATION PLAN - City of ...

ADOPTED BUDGET RESOURCE ALLOCATION PLAN - City of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project Information Sheet<br />

Project: 825241 Equipment Replacement at Six (6) Hetch-Hetchy Connections<br />

Origination Year: 2005-06<br />

Planned Completion Year: 2011-12<br />

Department: Public Works<br />

Project Description / Scope / Purpose<br />

Type: Water<br />

Category: Infrastructure<br />

Project Manager: Hira Raina<br />

Fund: 460 Water Supply and Distribution Fund<br />

Sub-Fund: 300 Water Infrastructure Subfund<br />

Project Coordinator: Val Conzet<br />

This project provides for the replacement <strong>of</strong> pressure reducing valves, gate valves, control valves and vaults, and for the installation <strong>of</strong> magnetic meters at six connections to the Hetch-Hetchy water<br />

supply pipeline. Most valves to be replaced are 8" to 16" in diameter. The equipment is being replaced because <strong>of</strong> age (40 to 50 years old) and to provide upgrades allowing each facility to be<br />

connected to the <strong>City</strong>'s Supervisory Control and Data Acquisition (SCADA) system.<br />

The SFPUC (Hetch-Hetchy) connections are located at Lawrence, Fair Oaks, Borregas, Lockheed, Palomar, and Mary.<br />

- Borregas Hetch-Hetchy was completed FY 2006/07.<br />

- Lawrence Hetch-Hetchy was completed FY 2008/09.<br />

- Palomar Hetch-Hetchy is in progress to be completed FY 2008/09.<br />

- Lockheed Hetch-Hetchy scheduled to start FY 2009/10.<br />

- Fair Oaks Hetch-Hetchy scheduled to start FY 2010/11.<br />

- Mary Hetch-Hetchy is scheduled to begin in FY 2011/12, but is contingent upon SFPUC approval.<br />

This budget reflects one connection being upgraded per year at $130,000.<br />

Project Evaluation and Analysis<br />

The project not only replaces old components, but also updates them so that they can be remote-controlled by the SCADA system. This will increase system efficiency and help during emergencies,<br />

by allowing staff to react more quickly to isolate possible problem points from the potable water system as a whole.<br />

Fiscal Impact<br />

This project is funded by the Water Supply and Distribution Fund.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

310,999 130,000 130,000 132,600 0 0 0 0 0 0 0 0<br />

0 703,599<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Equipment Replacement at Six (6) Hetch-Hetchy Connections 825241

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!