Project: 825221 Central Water Plant Building Improvements<br />

Origination Year: 2005-06<br />

Planned Completion Year: 2010-11<br />

Department: Public Works<br />

Project Description / Scope / Purpose<br />

This project provides funding for Central Water Plant Building reconstruction.<br />

Project Information Sheet<br />

Type: Water<br />

Category: Infrastructure<br />

Project Manager: Hira Raina<br />

Fund: 460 Water Supply and Distribution Fund<br />

Sub-Fund: 300 Water Infrastructure Subfund<br />

Project Coordinator: Val Conzet<br />

Funds budgeted in FY 2008/09 will be used to inspect and evaluate the site for termites and wood rot and to evaluate the existing equipment for replacement needs and construction design. After<br />

inspection, evaluation, and design, these funds will be used to install a new propane generator, magnetic flow meter, and underground piping. This project also includes refurbishment <strong>of</strong> the main<br />

building which is scheduled to begin in FY 2009/10 along with construction <strong>of</strong> a new storage facility. Part <strong>of</strong> the initial design budget will be used for inspection <strong>of</strong> the facilities to determine<br />

infrastructure integrity and an action plan. Even though the equipment is currently operational, it is over 40 years old and will require replacement soon.<br />

Project Evaluation and Analysis<br />

The Central Water Plant is a critical element <strong>of</strong> the <strong>City</strong>'s water supply system. Existing buildings have deteriorated, and equipment is worn and needs replacement.<br />

Fiscal Impact<br />

This project is a replacement <strong>of</strong> existing infrastructure with no significant fiscal impact, and is funded by the Water Supply & Distribution Fund.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

0 1,851,154 0 0 0 0 0 0 0 0 0 0<br />

0 1,851,154<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Central Water Plant Building Improvements 825221