Project: 825321 Replacement/Rehabilitation <strong>of</strong> Sanitary Manholes<br />

Origination Year: 2005-06<br />

Planned Completion Year: Ongoing<br />

Department: Public Works<br />

Project Description / Scope / Purpose<br />

Project Information Sheet<br />

Type: Wastewater<br />

Category: Infrastructure<br />

Project Manager: Hira Raina<br />

Fund: 465 Wastewater Management Fund<br />

Sub-Fund: 300 Wastewater Infrastructure Subfund<br />

Project Coordinator: Jim Craig<br />

The project provides funding for the replacement/rehabilitation <strong>of</strong> sanitary manholes. The sewer system infrastructure is on average 50 years old, with some parts considerably older. The system<br />

includes over 5,700 sewer manholes. This project provides funding to replace or rehabilitate manholes, depending on condition, at a rate <strong>of</strong> about 10 manholes/yr at an estimated cost <strong>of</strong> $7,500 per<br />

manhole.<br />

This project, which started in FY 2005/06, will systematically repair or replace deficient manholes. Deteriorated manholes will be identified during flushing and video inspection operations done<br />

routinely throughout the year.<br />

The project may need to be considered for expansion in the future, depending upon what is identified in the early years. The project is expected to be ongoing into the foreseeable future. Work will<br />

have to be coordinated with any planned street improvements as the program moves forward.<br />

Project Evaluation and Analysis<br />

If the manholes deteriorate to the point <strong>of</strong> collapse, they would constitute a hazard and would have to be replaced on an emergency basis, which would be considerably more costly than a scheduled<br />

replacement.<br />

Fiscal Impact<br />

This project is funded from the Wastewater Management Fund. There is no impact on the operating budget.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

111,281 117,552 75,000 76,500 78,030 79,591 81,182 82,806 84,462 86,151 87,874 89,632 1,058,356 2,108,417<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Replacement/Rehabilitation <strong>of</strong> Sanitary Manholes 825321