Project: 900468 Sunnyvale East Channel Trail (JWC Greenbelt to 237)<br />

Origination Year: 2007-08<br />

Planned Completion Year: 2011-12<br />

Department: Public Works<br />

Project Description / Scope / Purpose<br />

Project Information Sheet<br />

Type: Traffic & Transportation<br />

Category: Capital<br />

Project Manager: Hira Raina<br />

Fund: 141 Park Dedication<br />

Sub-Fund: 100 Subdivisions<br />

Project Coordinator: Jack Witthaus<br />

This project entails the construction <strong>of</strong> a trail on the Sunnyvale East Channel, from the John W Christian Greenbelt (JWCG) to Highway 237. The project would also include access to the trail, and<br />

Tasman Drive from the mobile home park located to the north <strong>of</strong> Tasman Drive. This project was identified as part <strong>of</strong> the Tasman/Fair Oaks Pedestrian and Bicycle Circulation Plan in order to<br />

improve access to schools, transit and open space in the neighborhood.<br />

Project Evaluation and Analysis<br />

The project will increase the service level by improving livability for the residents in the neighborhood. It also encourages increased pedestrian, bicycle and transit use through streetscape<br />

improvements, land use planning and architectural design.<br />

Fiscal Impact<br />

This project is currently unfunded. Staff recommends this project be included in the unfunded projects listing until revenue sources are secured. FY 2010/2011 costs are for design. Construction<br />

estimates budgeted in FY 2011/2012 is based on conceptual engineering completed in 2008.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Unfunded Project<br />

Project<br />

Life Total<br />

0 0 130,000 1,326,000 0 0 0 0 0 0 0 0<br />

0 1,456,000<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Sunnyvale East Channel Trail (JWC Greenbelt to 237) 900468