Project: 827000 Mathilda/First Street Sanitary Sewer Replacement<br />

Origination Year: 2007-08<br />

Planned Completion Year: 2012-13<br />

Department: Public Works<br />

Project Description / Scope / Purpose<br />

Project Information Sheet<br />

Type: Wastewater<br />

Category: Capital<br />

Project Manager: Hira Raina<br />

Fund: 465 Wastewater Management Fund<br />

Sub-Fund: 200 Wastewater Capital Subfund<br />

Project Coordinator: Jim Craig<br />

This project provides funding for sanitary sewer replacement on Mathilda/First Street. This project is for the replacement <strong>of</strong> approximately 2005 linear feet <strong>of</strong> existing 12" diameter sanitary sewer<br />

line on Mathilda/First Street with 18" diameter line. This upgrade is needed to accommodate additional capacity required for build out <strong>of</strong> the area, and is identified as a required mitigation by the<br />

M<strong>of</strong>fett Park Specific Plan, which was adopted by the Sunnyvale <strong>City</strong> Council on April 27, 2004 by Resolution 111-04. The useful life <strong>of</strong> the replaced sewer would be 40 years.<br />

Project Evaluation and Analysis<br />

Not upgrading the line will result in sewer capacity problems once the developments in the area take place. The project is a place holder. The actual timing <strong>of</strong> the project will depend on the future<br />

development <strong>of</strong> the area.<br />

Fiscal Impact<br />

The project is funded by the Wastewater Management Fund. The <strong>City</strong> would be reimbursed some <strong>of</strong> these upgrading costs by the future developments in the area.<br />

The line will be a replacement <strong>of</strong> existing sanitary sewer line and there should be no fiscal impact to the existing operations budget.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

0 0 0 154,385 441,100 0 0 0 0 0 0 0<br />

0 595,485<br />

Sewer Connection Fees 0 136,693 136,693 0 0 0 0 0 0 0<br />

0<br />

0 0 0 136,693 136,693 0 0 0 0 0 0 0<br />

0 273,386<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Mathilda/First Street Sanitary Sewer Replacement 827000