Project: 900210 Downtown Parking Management System<br />

Origination Year: 2005-06<br />

Planned Completion Year: 2016-17<br />

Department: Public Works<br />

Project Description / Scope / Purpose<br />

Project Information Sheet<br />

Type: Downtown<br />

Category: Capital<br />

Project Manager: Hira Raina<br />

Fund: 315 Redevelopment Special Revenue<br />

Sub-Fund: 100 Redevelopment General<br />

Project Coordinator: Jack Witthaus<br />

This project provides for the study, construction and operation <strong>of</strong> a parking management system at non-Town Center Mall facilities in the downtown. As part <strong>of</strong> the approval <strong>of</strong> the Block 18<br />

downtown redevelopment proposal, the <strong>City</strong> Council directed staff to study a parking management system for major downtown parking areas. This system would monitor parking supply and<br />

provide real time information to drivers about the availability <strong>of</strong> parking. The Town Center Mall developer is responsible for funding the parking system at the site. This project would fund the<br />

parking system at the non-Town Center sites only.<br />

Operating costs are required for calibration, maintenance, monitoring, detection and repair services needed to operate the parking system. Cost estimates were developed based on research <strong>of</strong><br />

parking system costs and consultation with jurisdictions with similar systems (in 07/08 dollars). Management <strong>of</strong> parking downtown will impact the <strong>City</strong>'s operations by placing a new, major, day to<br />

day responsibility <strong>of</strong> parking management. It will also increase the contract cost <strong>of</strong> traffic signal maintenance services or other required maintenance activities. This is reflected in the operation cost<br />

estimates. The life <strong>of</strong> the signs are approximately 20+ years (same as traffic signal structures); replacement <strong>of</strong> the system may be needed in the 10-20 year time frame, but cost estimates are not yet<br />

available.<br />

Staff shows a project being initiated in 2015 based on the estimated schedule for completion <strong>of</strong> the Town Center project.<br />

Project Evaluation and Analysis<br />

The project will reduce the hunt time for parking in the Downtown, which relieves traffic congestion, improves air quality, and benefits the downtown shopping experience. The project should be<br />

completed concurrent or soon after the Town Center development occurs. These project costs assume that no revenue will be generated by the project.<br />

Fiscal Impact<br />

This project is currently unfunded. Staff recommends this project been placed on the unfunded list until revenue sources are secured.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Unfunded Project<br />

Project<br />

Life Total<br />

0 0 0 0 0 0 0 205,359 1,047,331 0 0 0<br />

0 1,252,690<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 68,152 69,515 70,905 72,323 853,982 1,134,877<br />

Downtown Parking Management System 900210