Project Information Sheet<br />

Project: 827110 Update <strong>of</strong> Public Building Long-Range Infrastructure Plan<br />

Origination Year: 2005-06<br />

Planned Completion Year: 2010-11<br />

Department: Office <strong>of</strong> the <strong>City</strong> Manager<br />

Project Description / Scope / Purpose<br />

Type: Administrative Facilities<br />

Category: Infrastructure<br />

Project Manager: Bob Van Heusen<br />

Fund: 610 Infrastructure Renov & Replace<br />

Sub-Fund: 100 General Fund Assets<br />

Project Coordinator: Hira Raina<br />

This project provides for pr<strong>of</strong>essional services to update and complete the Long-Range Infrastructure Plan (LRIP) for the <strong>City</strong>'s public buildings. The <strong>City</strong>'s building infrastructure is aging and<br />

requires ongoing maintenance and component replacement. Ro<strong>of</strong>ing, HVAC, structural, and many other building related component replacements require scheduling to maintain our facility<br />

infrastructure. It is also necessary to evaluate the 89 buildings managed by Facility Services to determine the optimal replacement schedule.<br />

Funds in FY 2008/09 take the existing building condition assessment data that was developed in the LRIP and update, organize, and coordinate this information. It would also enter it in a Webbased<br />

format that would produce projects annually based on the conditional data and provide current job costing figures for building infrastructure projects. This data would determine the optimum<br />

time to replace and/or consolidate buildings and services that occupy <strong>City</strong> buildings. The results <strong>of</strong> this study will provide the basis for a strategic plan for the building infrastructure and will effect<br />

a number <strong>of</strong> projects in the CIP.<br />

Project Evaluation and Analysis<br />

This project is necessary to track building needs based on actual conditional building assessments and provide long range cost planning for facility infrastructure needs to maintain building integrity<br />

and safety for users. It is also important for staff to have a strategic plan for replacement <strong>of</strong> structures and alternatives for building locations, size, and types <strong>of</strong> services housed together in the same<br />

structure and when the optimum time is for replacement based on a variety <strong>of</strong> factors.<br />

Fiscal Impact<br />

Funds for this project are for consultant services and strategic plan development. This project will be funded by users <strong>of</strong> the buildings in proportion to their actual use. This includes transfers from<br />

the General Fund, General Services Fund, Water Supply and Distribution Fund, and Wastewater Management Fund.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

0 200,000 0 0 0 0 0 0 0 0 0 0<br />

0 200,000<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 38,000 0 0 0 0 0 0 0 0 0 0<br />

0 38,000<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Update <strong>of</strong> Public Building Long-Range Infrastructure Plan 827110