development citywide. The fees are to be applied to a<br />

specific list <strong>of</strong> roadway capacity improvement projects<br />

that were identified using a citywide transportation<br />

model and updated every five years. These projects are<br />

detailed in the Transportation Strategic Program.<br />

Traffic & Transportation Projects<br />

The major funded projects in the Traffic and<br />

Transportation category are:<br />

Traffic Signal Hardware and Wiring. This project<br />

provides for the replacement <strong>of</strong> traffic signal<br />

underground conduits and signal pole structures.<br />

Underground cables and conduits have a life<br />

expectancy <strong>of</strong> 20-40 years, with an average <strong>of</strong> 35 years.<br />

This project funds one location per year over the 20<br />

year financial plan for a total <strong>of</strong> $8.7 million.<br />

Mathilda Avenue Railroad Overpass Improvements.<br />

The State <strong>of</strong> California Department <strong>of</strong> Transportation<br />

(CalTrans) has rated the existing bridge, located at<br />

Mathilda Avenue and the Caltrain railroad tracks,<br />

below standard. The design phase <strong>of</strong> this project is<br />

complete, and construction began in late FY<br />

2009/2010 and is expected to be complete in<br />

FY 2012/2013.<br />

The total project cost is budgeted at $36 million;<br />

however, construction bids have come in significantly<br />

lower than that amount. The project is primarily<br />

funded by a Federal Highway Bridge Program grant,<br />

which will pay for 88% <strong>of</strong> the construction costs. Staff<br />

is pursuing other funding sources for the <strong>City</strong>’s share,<br />

including Federal stimulus funds. So far, a $524,000<br />

grant from Measure A, through the Valley<br />

Transportation Authority (VTA), has been received. The<br />

remaining <strong>City</strong> share will be financed by the Gas Tax<br />

Fund and Traffic Mitigation Fees.<br />

Pavement Rehabilitation and Annual Slurry Seal <strong>of</strong><br />

<strong>City</strong> Streets. Every year staff surveys the condition <strong>of</strong><br />

half <strong>of</strong> the streets throughout the <strong>City</strong> and schedules<br />

the repair, slurry seal, double chip seal, overlay and<br />

reconstruction <strong>of</strong> these streets accordingly. A constant<br />

level <strong>of</strong> funding for pavement rehabilitation is budgeted<br />

in the operating program. The Pavement Rehabilitation<br />

project budgets the additional funds needed in the<br />

years where more extensive rehabilitation work is<br />

required. The Annual Slurry Seal <strong>of</strong> <strong>City</strong> Streets is a<br />

new project to move the slurry seal expenditures from<br />

the operating program for better tracking because the<br />

work <strong>of</strong>ten crosses fiscal years. A total <strong>of</strong> $21.4 million<br />

is budgeted over the 20 years for the two projects. $4.6<br />

million is budgeted annually in the Pavement<br />

Operations Program (120).