Project: 828610 Concrete Reconstruction<br />

Origination Year: 2009-10<br />

Planned Completion Year: 2010-11<br />

Department: Public Works<br />

Project Description / Scope / Purpose<br />

Project Information Sheet<br />

Type: Traffic & Transportation<br />

Category: Capital<br />

Project Manager: Leonard Dunn FY0910<br />

Fund: 385 Capital Projects<br />

Sub-Fund: 100 General Fund Assets<br />

Project Coordinator: Joanna De Sa<br />

This project will replace sidewalks, curbs, gutters and driveways at approximately 350 locations in Sunnyvale that have been identified as requiring replacement within the last five years.<br />

Project Evaluation and Analysis<br />

This project will remove approximately 350 identified locations from the Concrete Maintenance program's deferred maintenance listing. These locations have identified sidewalk conditions that<br />

require replacement to remedy potential trip hazards and/or curb and gutters where adequate street water run<strong>of</strong>f is inadequate.<br />

Fiscal Impact<br />

The total construction cost <strong>of</strong> the project, including a 10% contingency, is $605,000. There is no net fiscal impact to the <strong>City</strong> for utilizing the $605,000 <strong>of</strong> remaining Proposition 1B funds<br />

(originally appropriated for the Wolfe Road Caltrain Overcrossing project) for this project. <strong>City</strong> staff, however, will provide tree root mitigation and contract supervision and inspection. These<br />

costs have been budgeted in Program 217 - Concrete Maintenance.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

0 605,000 0 0 0 0 0 0 0 0 0 0<br />

0 605,000<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 605,000 0 0 0 0 0 0 0 0 0 0<br />

0 605,000<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Concrete Reconstruction 828610