23.07.2013 Views

ADOPTED BUDGET RESOURCE ALLOCATION PLAN - City of ...

ADOPTED BUDGET RESOURCE ALLOCATION PLAN - City of ...

ADOPTED BUDGET RESOURCE ALLOCATION PLAN - City of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project: 828140 CDBG Sidewalk Replacement<br />

Origination Year: 2009-10<br />

Planned Completion Year: 2010-11<br />

Department: Public Works<br />

Project Description / Scope / Purpose<br />

Project Information Sheet<br />

Type: CDBG<br />

Category: Infrastructure<br />

Project Manager: Lorrie Gervin<br />

Fund: 110 Community Development Block Grant<br />

Sub-Fund: 100 CDBG Fund<br />

Project Coordinator: none<br />

Concrete replacement cost exceeds annual funding by approximately sixty percent. Therefore, sites that cannot be replaced are deferred. Approximately 400 sites requiring replacement are<br />

discovered each year, with current funding sufficient to replace around 160 sites. Ongoing deferral cannot be maintained indefinitely and the current <strong>City</strong>-wide backlog <strong>of</strong> sites is 1,108. In FY<br />

2009/10 CDBG funds have been allocated to address repairs at 211 sites that are located in CDBG-eligible areas.<br />

Project Evaluation and Analysis<br />

With discovery <strong>of</strong> <strong>of</strong>f street ROW concrete exceeding the funding available for the replacement on an annual basis, the primary solution is to replace the concrete rather than allow a deferred<br />

maintenance list to increase indefinitely. There are alternatives to concrete sidewalk replacement (i.e. use <strong>of</strong> interlocking pavers and rubber sidewalk panels). The limitation is funding. The<br />

alternatives, on a cost per square foot basis, are more expensive than poured in place concrete.<br />

Fiscal Impact<br />

This project is funded by CDBG funds. An unfunded project exists (900666) for the remaining backlog <strong>of</strong> sidewalk replacements that are necessary but do not have funding.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

0 450,000 0 0 0 0 0 0 0 0 0 0<br />

0 450,000<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

CDBG Sidewalk Replacement 828140

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!