Project: 828370 Chemical Storage Washington Pool<br />

Origination Year: 2009-10<br />

Planned Completion Year: 2010-11<br />

Department: Community Services<br />

Project Description / Scope / Purpose<br />

Project Information Sheet<br />

Type: Parks & Recreation<br />

Category: Infrastructure<br />

Project Manager: Cathy Merrill<br />

Fund: 610 Infrastructure Renov & Replace<br />

Sub-Fund: 100 General Fund Assets<br />

Project Coordinator: Nancy Grove<br />

The Department <strong>of</strong> Public Safety recently cited the chemical containment storage at Washington Park as inadequate for the secondary storage <strong>of</strong> liquid chlorine. The Washington Park storage<br />

facility serves Columbia Pool, Lakewood Pool, and Sunnyvale Middle School Pool. This project will address the shortcomings by providing secondary containment for swimming pool chemicals<br />

by renovating the Washington Pool storage and filter area located under the bleachers. Currently the area is used to store <strong>City</strong> vehicles, provide an <strong>of</strong>fice for Parks workers, and store chemicals.<br />

The area that currently provides parking for the pool maintenance truck would be converted to an additional chemical storage area which would provide the storage space needed for secondary<br />

containment. In turn, fencing and concrete will be added to another area <strong>of</strong> the facility to park the displaced pool truck.<br />

Project Evaluation and Analysis<br />

Through internal inspections by Public Safety, Washington Pool has been cited for inadequate secondary containment <strong>of</strong> liquid chlorine. Currently, there is no room for the needed secondary<br />

containment. The project cost <strong>of</strong> $10,000 is far below the cost <strong>of</strong> other options investigated by staff.<br />

Fiscal Impact<br />

This project is funded by a General Fund transfer and would require no additional operating costs.<br />

Project Financial Summary<br />

Financial Data Prior<br />

Actual<br />

Project Costs<br />

Revenues<br />

Total<br />

Transfers-In<br />

Total<br />

Operating Costs<br />

Current 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 Y11-Y20<br />

2009-10<br />

Total<br />

Project<br />

Life Total<br />

0 10,000 0 0 0 0 0 0 0 0 0 0<br />

0 10,000<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0<br />

Chemical Storage Washington Pool 828370